wayground logo

Free Printable Worksheets

Font size

S
M
L
XL
Worksheets

Automation Tribe Party

Total questions: 11

Worksheet time: 2mins

Name
Class
Date
1.

What has a head, a tail, but does not have a body?

a)

Kitten

b)

Spongebob

c)

Flower vase

d)

Coin

2.

Who is accountable for maximizing the value of the product resulting from the work of the Scrum Team?

a)

Product Owner

b)

Scrum Master

c)

Developer

d)

Business User

3.

What does everyone need, want, and ask but never take?

a)

Money

b)

Love

c)

Advice

d)

Food

4.

How many months have 28 days?

a)

2

b)

1

c)

All of them

d)

Depends if there's a leap year or not

5.

What is the name of the Scrum Event that used by the Scrum Teams inspects how the last Sprint went with regards to individuals, interactions, processes, tools, and their Definition of Done?

a)

Sprint Planning

b)

Retrospective

c)

Daily Scrum

d)

Sprint Review

6.

What is not the main advantage of eDoc?

a)

Templating Engine

b)

Configurable API Callback

c)

Content Management

d)

Cloud Ready Architecture

7.

If there are 6 apples and you take away 4, how many do you have?

a)

2

b)

4

c)

3

d)

1

8.

which one is not a DevOps tool?

a)

JIRA

b)

JFrog Artifactory

c)

Jenkins

d)

Collaborate

9.

Name all the numbers from 1 – 100, which have the letter ‘A’ in their spellings?

a)

19

b)

29

c)

NONE

d)

30

10.

Which LBU has implemented eDoc?

a)

Laos

b)

Myanmar

c)

UK

d)

Brunei

11.

Who is He?

a)

Mr. Julius

b)

Mr. Andjie

c)

Mr. Lee Min Ho

d)

Mr. Rizqi