SHASSIC 2018

Total questions: 15

Worksheet time: 8mins

Name
Class
Date
1.

What is SHASSIC ?

SHASSIC is an INDEPENDENT method to ASSESS and EVALUATE the SAFETY & HEALTH PERFORMANCE for construction works/projects.

True / False

a)

True

b)

False

c)

Maybe

2.

what is SHASSIC of a full sentence in English

a)

Safety and Health Assessment Culture in Construction

b)

Safety and Health Audit System in Construction

c)

Safety and Health Assessment System in Company

d)

Safety and Health Assessment System in Construction

3.

SHASSIC

Assessment Approach

a)

Document Check

b)

Workplace Inspection

c)

Interview

d)

all above

4.

Document Check Category B is ?

a)

Working Personnel

b)

Managerial Personnel

c)

Supervisory Personnel

d)

Family Personnel

5.

Category B

Supervisory Personnel

(Which is incorrect)

a)

Site Supervisor,

b)

Designated Person

c)

OSH Committee Members

d)

Safety Health Officer

e)

Project Engineer

6.

Assessment Checklist

INTERVIEW

a)

186 checklist

b)

168 checklist

c)

115 checklist

d)

88 checklist

7.

SHASSIC Score in 61%, how many star rating?

a)

1 star

b)

2 star

c)

3 star

d)

4 star

e)

5 start

8.

SHASSIC Assessment must be Physical progress of project must be within ?

a)

35%-85%

b)

10% -99%

c)

25%-75%

d)

Anytime

9.

Determination of legal requirements and other requirements during construction planning stage shall inclusive the following:

i) Project register with JKR

ii) All project construction personnel possessed valid CIDB Green Card.

iii) Validity of CIDB registration

iv) Project manager personnel are accessible to up to date legal requirements and other requirements.

v) Documented legal requirements and other requirements action plan available.

a)

I, II , III & IV

b)

II, III, IV and V

c)

I, III, IV and V

d)

all of the above

10.

What is the full name of CIDB

(a)  

11.

CIDB will check and uses SHASSIC Scope for the following purpose. Pick the correct ANSWER.

i) for identity training needs.

ii) to identity weak contractor in OSH management.

iii) to have a standard system an OSH

iv) to check a valid CIDB Registration Certificate.

a)

I only

b)

II and III only

c)

I, II and III only

d)

All the above

12.

When did the movement control order was enforced in the response to the Covid 19 pandemic in Malaysia?

a)

16 March 2020

b)

18 March 2020

c)

27 March 2020

d)

31 March 2020

13.

One of the element / checklist for workplace inspection of site OSH management component is :

a)

JKG 103 form retained as project site

b)

JKJ105 form retrained as project site

c)

JKG 107 form retained as project site

d)

JKJ 103 form retained as project site

14.

for the purpose of SHASSIC, documents refer to:

i) Comunication of information

ii) evidence of conformity

iii) knowledge sharing and OSH training.

iv) to disseminate and preserve the organizations experiences

a)

I and II only

b)

II and III only

c)

I, II and III only

d)

all the above

15.

For the purpose of SHASSIC, working at height means work in any place where, if there

were no precautions in place, a person could fall from the distance __________.

a)

above 2 meters

b)

below 2 meters

c)

above 3 meters

d)

of 2 meters