WorksheetsBPS3153 - PROCESS SAFETY LOSS PREVENTIO
Total questions: 10
Worksheet time: 6mins
Which of the following is not the OSHA PSM element?
Process Safety Database
Process Safety Information
Pre-Startup Safety Review
Hot Work Permit
Maintain complete and accurate information on the chemicals, technology, and equipment information.
Operating procedures
Process Hazard Analysis
Management of Change
Process Safety Information
Ensure all information is available to support the PSM rule. When necessary, confidential or nondisclosure agreements may be used.
Trade Secrets
Management of Change
Pre-Startup Safety Review
Process Hazards Analysis
Provide clear written instructions for safely conducting operations at each covered process.
Process Safety Information
Process Hazard Analysis
Operating Procedures
Emergency Planning and Response
All of these installations must not be applied in PSM rules EXCEPT:
Installation of less than 10% of threshold quantity (TQ) of HHC
The plant is located in an unoccupied remote location
An installation under the armed forces
An explosive petrochemical plant installation
Which of the following is NOT related to Process Safety Management (PSM)
Provide initial and refresher training to employees involved in plant operation.
Employees are provided access to information regarding all PSM elements.
Employees are provided with clear written instructions for safely conducting activities at the site operation.
Employees are given tasks to be working as contractors by doing the subcontractor operations in safe operation.
The Management of Change (MOC) element covers the procedures to manage changes of replacement in kind.
TRUE
FALSE
MOC procedure shall be done to manage the temporary and permanent changes except for replacement in kind.
TRUE
FALSE
Replacing a vessel with a larger vessel constructed of the same materials. MOC is required?
YES
NO
Reconfiguring office spaces in a plant. Required MOC?
YES
NO