1.

What is the Overall view of optimisation within project control.

a)

Manage intentional change and continuous improvement

b)

Procurement bulk buying

c)

Spend the entire project budget within the shortest time possible

d)

Risk assessment and mitigation

2.

What is the most reasonable generalised term for resource optimisation?

a)

Ensure all tasks are complete without quality checks

b)

Who, What, Why

c)

Who, What, Where, When

d)

Allow only easy cost free changes to be authorised

3.

Which option is not a critical project resource?

a)

People

b)

Funds

c)

Material

d)

Stationary

4.

Select the most important project resource from the list below

a)

Computer software

b)

Contract agreement

c)

People

d)

Himalayan go to farmers

5.

Which estimate class is the least optimal?

a)

Class four

b)

Class three

c)

Class two

d)

Class one

6.

Risk is part of the optimisation process

a)

True

b)

False

7.

Choose the correct risk statement from the options below

a)

Enhance a threat to make sure it happens

b)

Always ignore opportunities

c)

Always except risks from other organisations

d)

Understand risks and threats, identify, manage and control

8.

Which phrase is correct

a)

What if scenario is a process

b)

What if scenario is a tool

c)

What if scenario is a technique

d)

What if scenario it is the same as change control

9.

Select the correct LEAN definition

a)

Maximise waste and minimise value

b)

Ignore subject matter experts

c)

Maximise value and minimise waste

d)

Increase the scope of work and maximise the chance of scope creep

10.

Which is the correct sequence in the structure of six Sigma

a)

Improve measure define analyse control

b)

Define measure control analyse improve

c)

Define measure analyse improve control

d)

Control analyse improve measure define

11.

What does PDC a refer to within the quality process

a)

Paint and decorate characterise act

b)

Plan draw construct assess

c)

Plan do check assess

d)

Plan do check act

12.

Which key performance indicator is used to measure project performance

a)

Change request

b)

Planned cost

c)

Price

d)

All options

13.

What should be considered when attempting to optimise project goals

a)

Contractors Timesheets

b)

Stakeholder requirements

c)

Project title

d)

Location of the medical facility

14.

Which option is not involved with attempting to rescue feeling project

a)

Finding out the root cause

b)

Look for solutions

c)

Reduce the project scope

d)

Ask Bob from down the pub