What is the Overall view of optimisation within project control.
Manage intentional change and continuous improvement
Procurement bulk buying
Spend the entire project budget within the shortest time possible
Risk assessment and mitigation
What is the most reasonable generalised term for resource optimisation?
Ensure all tasks are complete without quality checks
Who, What, Why
Who, What, Where, When
Allow only easy cost free changes to be authorised
Which option is not a critical project resource?
People
Funds
Material
Stationary
Select the most important project resource from the list below
Computer software
Contract agreement
People
Himalayan go to farmers
Which estimate class is the least optimal?
Class four
Class three
Class two
Class one
Risk is part of the optimisation process
True
False
Choose the correct risk statement from the options below
Enhance a threat to make sure it happens
Always ignore opportunities
Always except risks from other organisations
Understand risks and threats, identify, manage and control
Which phrase is correct
What if scenario is a process
What if scenario is a tool
What if scenario is a technique
What if scenario it is the same as change control
Select the correct LEAN definition
Maximise waste and minimise value
Ignore subject matter experts
Maximise value and minimise waste
Increase the scope of work and maximise the chance of scope creep
Which is the correct sequence in the structure of six Sigma
Improve measure define analyse control
Define measure control analyse improve
Define measure analyse improve control
Control analyse improve measure define
What does PDC a refer to within the quality process
Paint and decorate characterise act
Plan draw construct assess
Plan do check assess
Plan do check act
Which key performance indicator is used to measure project performance
Change request
Planned cost
Price
All options
What should be considered when attempting to optimise project goals
Contractors Timesheets
Stakeholder requirements
Project title
Location of the medical facility
Which option is not involved with attempting to rescue feeling project
Finding out the root cause
Look for solutions
Reduce the project scope
Ask Bob from down the pub