Worksheetslean manufacturing
Total questions: 13
Worksheet time: 7mins
A methodology that focuses on minimizing waste within manufacturing systems while simultaneously maximizing productivity is called
Lean manufacturing
Quality Assurance
Planning
None of the above
Lean manufacturing practices are initiated by
Ford
Toyota
Benz
Maruthi
TPS is
Toyota Planning System
Toyota Production System
Toyota Power System
Toyota Public System
The principles underlying the TPS are embodied in The Toyota Way (a book )written by
Dr. Jeffrey Liker
Frederick Winslow Taylor-
Frank B.Gilbreth
Elton Mayo
The Japanese Engineer ,Who developed Toyota Production System is
Taiichi Ohno
Elton Mayo
Henry Fayol
Henry Gantt
The average time between the start of production of one unit and the start of production of the next unit, when these production starts are set to match the rate of customer demand is called as
Takt Time
Lead Time
Pull System
Jidoka
The concept of ________ is “Automatic detection of problems or defects at an early stage and proceed with the production only after resolving the problem at its root cause”.
Pull System
Jidoka
Lead time
Takt Time
Jidoka is Principle in Toyota production system and was developed by the Japanese industrial designer ______ at the start of the 20th century.
Shingeo Shingo
Dr. Jeffrey Liker
SakichiToyoda
Taiichi Ohno
The amount of time it takes from the moment a customer places an order to the moment the product is out for a delivery.
Lead time
Takt time
Production time
Pull System
The name given in lean manufacturing for documenting the steps of a job task and the sequence in which those should be performed
Standardized work
Stability
Takt Time
Lead Time
A Japanese word in Lean Manufacturing for leveling is
Heijunka
Jidoka
Kaizen
Poka Yoke
A business methodology that aims to provide a new way to think about how to organize human activities to deliver more benefits to society and value to individuals while eliminating waste.
Lean Thinking
Takt time
Pull System
Lead Time
Any activity that physically changes the material being worked on (Not Repair/Rework) is called
Value added Activity
None Value added Activity
Pull System
None of the above