wayground logo

Free Printable Worksheets

NEW

Font size

S
M
L
XL
Worksheets

SMED

Total questions: 10

Worksheet time: 3mins

Name
Class
Date
1.

What is SMED stand for

a)

Simple Mean Equal Day

b)

Single Minute Exchange Day

c)

Single Minute Exchange of Dies

d)

Single Minute Change Dies

2.

Tool SMED are best use in

a)

Change Time

b)

Change Product

c)

Change Over

d)

Change Mood

3.

Who are the best to use SMED Tool

a)

Board of Director

b)

Top/Middle Management

c)

Engineers

d)

Employee

4.

How many phase in total for SMED

a)

5

b)

3

c)

2

d)

7

5.

Successful SMED program will have the following benefits

a)

Lower manufacturing cost

b)

Lower inventory levels

c)

Improved responsiveness to customer demand

d)

All Answer are correct

6.

There are two types of elements of SMED as

a)

Inter and Outer

b)

Internal and External

c)

In and Out

d)

Front and Back

7.

What is the sequence of SMED Process

a)

Cleaning, Set Up, Standardize

b)

Separate, Convert, Streamline

c)

Set, Sort, Set in Order

d)

Plan, Do, Check

8.

What is the main benefit of SMED

a)

Lower cost

b)

Shorter changeover time

c)

Better productivity

d)

All answer are correct

9.

Employees can take part in SMED as

a)

Directly involved in improvement activities

b)

Active participation in idea generation

c)

Actively carry out improvement actions

d)

All answer are correct

10.

What is the last phase of SMED

a)

Larger Investment

b)

Creating Parallel elements

c)

Streamlining the elements

d)

Converting internal time to external time