wayground logo

Free Printable Worksheets

Font size

S
M
L
XL
Worksheets

INDUSTRIAL MANAGEMENT MODEL EXAM-02

Total questions: 28

Worksheet time: 24mins

Name
Class
Date
1.

token no

4 lines
2.

name

4 lines
3.

section

4 lines
4.

__________is defined as the art and science of directing industrial activities.

a)

system

b)

institute

c)

admin

d)

management

5.

_________ determines the objectives and policies of the enterprise.

a)

organization

b)

company

c)

adminstration

d)

management

6.

____________ is an executing function.

a)

management

b)

adminstration

c)

organization

d)

system

7.

__________ is a decision-making function.

a)

management

b)

adminstration

c)

organization

d)

system

8.

__________ is known as ‘The Real Father of modern management theory’

a)

henry gantt

b)

henry fayol

c)

frank gilberth

d)

federick taylor

9.

The degree to which a specific product satisfies the wants of specific consumer or it is called consumer’s preference____________

a)

efficiency

b)

assurance

c)

quality control

d)

inspection

10.

___________measures the qualities of a product or service in terms of pre-decided standards

a)

efficiency

b)

assurance

c)

quality control

d)

inspection

11.

The report of each inspection is given in a printed form known as ________

a)

coupon

b)

acknowledgement

c)

report

d)

inspection ticket

12.

The method of Inspection, in which each and every unit manufactured is inspected to meet the desired specifications is called_______

a)

screening

b)

planning

c)

checking

d)

watching

13.

A scientific approach of solving problems and making workplace improvement is done by_________

a)

QC tools

b)

inspection

c)

analysing

d)

recreating

14.

A diagram which represents meaningful relationship between an effect and its causes

a)

pareto gragh

b)

check sheet

c)

cause and effect diagram/fish bone diagram

d)

histogram

15.

how many QC tools are available?

a)

1

b)

4

c)

6

d)

7

16.

SQC stands for__________

a)

Stratergy Quality Control

b)

Statistical Quality Control

c)

Statistical Quality Check

d)

Stratergy Quality Council

17.

The ISO 9000 series of standards was created by the_______________________ in order to develop and internationally uniform quality standard system.

a)

International Standards Organization

b)

International System of Organization

c)

International Socialization Organization

d)

Indian System Organization

18.

There are_____ standards in the ISO 9000 series

a)

ISO 9000 – 9005

b)

ISO 9000 – 9004

c)

ISO 9000 – 9006

d)

ISO 9000 – 9008

19.

___________________ can be basically divided into Environmental Policy, planning, implementation and operation, checking and corrective action, and management review.

a)

Environmental Managing System – ISO 14001

b)

Environmental Management System – ISO 14001

c)

Entire Management System – ISO 14001

d)

Environmental Measurement System – ISO 14001

20.

OHSAS stands for (a)  

21.

The goals of ________ include the elimination of waste, to increase productivity

a)

kaizen

b)

kanban

c)

5s

d)

JIT

22.

_________ extends to fields like labour relation, marketing practices, suppler relations and in house systems & procedures the emphasis is process – oriented efforts for improvement.

a)

kaizen

b)

kanban

c)

5s

d)

JIT

23.

JIT stands for (a)  

24.

_______Means mistake proofing or foolproof mechanism.

a)

KAIZEN

b)

KANBAN

c)

JIT

d)

POKA YOKA

25.

The is an integrated socio-technical system, developed by Toyota that comprises its management philosophy and practices.

a)

Toyota Production System (TPS)

b)

Toyota Planning System (TPS)

c)

Toyota Product System (TPS)

d)

Toyota Profound System (TPS)

26.

_______________ is a methodology that focuses on minimizing waste within manufacturing systems while simultaneously maximizing productivity.

a)

lean manufacturing

b)

production

c)

profit methodoldy

d)

stratergy

27.

Any activity that physically changes the material being worked on (Not Repair/Rework) is called

a)

Value added

b)

non-Value added

28.

TPM full form (a)