CMMI V2.0 Process Writing Pre-Test

Total questions: 15

Worksheet time: 15mins

Name
Class
Date
1.
Which of the following is the definition of a PROCESS?
a)
a.    A set of related or interacting activities, which transform inputs into outputs
b)
b.    It is a sequence of activities with a realization order in time, which converts a given input into an output
c)
c.     Any activity, or set of activities, that uses resources to transform input elements into results can be considered as a process
d)
d.    All of the above is true
2.
Which of the following is TRUE about a PROCEDURE?
a)
a.     It is a specified way to carry out an activity or a process
b)
b.    It is a process that must happen in a specified way
c)
c.     It is mandatory
d)
d.    All the above is true
3.
A ________ describes the correct steps to perform a task.
a)
a.     Practice
b)
b.    Process
c)
c.     Work Instruction
d)
d.    Policy
4.
A ________ is a guideline or the official position with respect to a topic.
a)
a.     Process
b)
b.    Procedure
c)
c.     Practice
d)
d.    Policy
5.
Which of the following is TRUE of a PRACTICE?
a)
a.     A set of organizational resources designed for performing work or accomplishing an objective
b)
b.    Is repetition of an activity to improve skill
c)
c.     Is about who does it and how
d)
d.    All of the above
6.
In CMMI V2.0, a _____________ is a collection of similar practices that together achieve the defined intent and value.
a)
a.     Model
b)
b.    View
c)
c.     Capability Area
d)
d.    Practice Area
7.
Which PA/s would address the Process Engineering aspect in a Software Development Organization?
a)
a.     MPM
b)
b.    PACM
c)
c.     PAD
d)
d.    All of the above
8.
Which PA/s would address the Product Development aspect in a Software Development Organization?
a)
a.     PR
b)
b.    PI
c)
c.     TS
d)
d.    All of the above.
9.
Concise means…?
a)
a.     Accurate, exact…
b)
b.    Succinct
c)
c.     Brief
d)
d.    Verbose
10.
Which Process Model did IBM Introduce?
a)
a.     Gantt
b)
b.    PERT
c)
c.     ETVX
d)
d.    IDEFs
11.
Which is/are control that has/have been purposely placed on a process to prevent undesirable outcomes?
a)
a.     Checkpoint
b)
b.    Audit
c)
c.     Policies
d)
d.    All of the above
12.
A limitation imposed on a process is called a _________?
a)
a.     Control
b)
b.    Constraint
c)
c.     Requirement
d)
d.    All of the above.
13.
The Extended EITVOX Chart includes ______?
a)
a.     Tools
b)
b.    Skills
c)
c.     Other Stakeholder
d)
d.    All of the above
14.
Which Process Element addresses ‘Where is the Activity performed’?
a)
a.     Flow
b)
b.    Context
c)
c.     Procedure
d)
d.    Purpose
15.
Which Process Element addresses ‘How is the Activity implemented’?
a)
a.     Flow
b)
b.    Context
c)
c.     Procedure
d)
d.    Purpose