1.

The two West Gate tunnel boring machines drilling heads are what size in diameter?

a)

7.2 metres

b)

15.6 metres

c)

12.7 metres

d)

10.8 metres

e)

Just large enough for one car, a matchbox car

2.

The new fast rail link from Melbourne to Geelong will save commuters how much travel time?

a)

15 mins

b)

22 mins

c)

5 mins

d)

37 mins

e)

It actually adds time

3.

For LXRA (Level Crossing Removal Authority), how many level crossings have been removed to date?

a)

76

b)

34

c)

0

d)

46

e)

What is a level crossing and why remove it?

4.

For NELP (North East Link Project), what is the projected number of vehicles that will use this each day?

a)

It will be used for foot traffic only

b)

135,000

c)

85,000

d)

442,000

e)

10 big trucks

5.

What is the projected travel time on the Melbourne Airport Rail between the CBD & Melbourne Airport (providing it doesn't crash)?

a)

23 mins

b)

70 mins

c)

45 mins

d)

30 mins

e)

It would be quicker to walk

6.

Which of the following is not going to be the name of a new station for the Metro Tunnel?

a)

Arden Station

b)

Parkville Station

c)

National Library Station

d)

Town hall Station

e)

Anzac Station

7.

The Metro Tunnel TBMs (Tunnel Boring Machines) chew through how much ground per day?

a)

10 metres

b)

25 metres

c)

There was no TBM, it was done by one man and his shovel

d)

98 metres

e)

48 parking meters

8.

The Monash Freeway upgrade will add 36kms of new traffic lanes. What is the forecasted cost for this project?

a)

510 million

b)

3.2 billion

c)

1.1 billion

d)

750 million

e)

2 billion with a 30% discount for paying in caaaa$h

9.

LXRA are removing how many dangerous and congested level crossing across Melbourne by 2025?

a)

0 - They were all assessed as being safe

b)

36

c)

52

d)

99

e)

75

10.

Who will be issuing confined space entry permits in the near future at Melbourne Water?

a)

Contractors are free to do what they want without permits, providing they cut corners for efficiency

b)

Onus is on the contractor under the new scheme - you break it, you buy it

c)

As well as unclogging toilets, the facilities team will be taking this on

d)

The CROs (Customer Response Officers)

e)

All MW staff will be able to grant CSE permits to anyone who wishes to use our drain as a waterslide

11.

How well did the MIPs team do this morning hosting the SAM bi-monthly meeting?

a)

b)

⭐⭐

c)

⭐⭐⭐

d)

⭐⭐⭐⭐

e)

⭐⭐⭐⭐⭐

12.

My favourite part of this mornings meeting was what?

4 lines
13.

I have increased my knowledge in which MIPs area?

a)

Knowing what the MIPs team does as a whole

b)

Different major infrastructure projects in Melbourne

c)

Identifying MIPs projects and the associated team members

d)

Understanding the benefits MIPs provides to the organisation

e)

I didn't pay attention