wayground logo

Free Printable Worksheets

NEW

Font size

S
M
L
XL
Worksheets

Purchasing & Procurement

Total questions: 10

Worksheet time: 3mins

Name
Class
Date
1.

The crucial buyer’s job:

a)

Determining the best price

b)

Determining how much to buy

c)

Determining the optimum time to make the purchase

d)

Determining which product or service meets the needs of the organization

2.

McDonald and Burger King:

a)

Independent Operation

b)

Small “Owner-op

c)

Medium sized operation

d)

Multi-units and Franchises

3.

The first step before purchase raw materials:

a)

Identify sub category.

b)

Plan menus.

c)

Contact vendor

d)

Determined item spesification.

4.

Ahmad Wakanda decided to buy the instant pineapple filling instead making it from scratch.

a)

What if analysis

b)

make-or-buy analysis

c)

value analysis

d)

Forecasting

5.

Siti Talia Al-Ghul predict that her next bakery shop will be high traffic due to her awesome feedback inviting K-pop artist to her shop.

a)

What-if analysis

b)

make-or-buy analysis

c)

value analysis

d)

forecasting

6.

Chef Leklupaperoger have propose with proof of using vanilla essence instead of vanilla pod in his cupcake, and his boss decided to proceed with this method to reduce cost.

a)

What-if analysis

b)

Forecoasting

c)

Value analysis

d)

make-or-buy analysis

7.

Using mathematical equation to analyse future food cost.

a)

What-if analysis

b)

make-or-buy analysis

c)

value analysis

d)

forecasting

8.

The utmost activity of purchasing?

a)

Maintain quality

b)

Minimize investment

c)

To get the lowest EP cost

d)

Maintain adequate supply

9.

Dora the buyer less knowledgeable about food, therefore she always deliver improper substitute food ingredients without consult from the supplier and her chef.

a)

Problem of the buyer

b)

Purchasing objective

c)

Research activities

d)

Purchasing activities

10.

The 2nd important in purchasing activities:

a)

Maintain quality

b)

Minimize investment

c)

Maintain adequate supply

d)

Obtain the lowest possible EP cost