APQP Training - VP Event - Part 1

Total questions: 11

Worksheet time: 6mins

Name
Class
Date
1.

What are the Vehicle Prototype (VP) requirements?, select all applicable.

a)

Confirmation of Tool Readiness

b)

Parts produced from hard tools

c)

SCA stage 1 conducted

d)

DCP confirmed

2.

Parts PO will be released and received before VP build

a)

True

b)

False

3.

What is not a Technical Documentation?

a)

SC-CC / Consequence class defined

b)

Material Specification

c)

DCP

d)

Technical Regulations (TR)

e)

Drawing and Measuring Point (MP) Drawing ready

4.

The objective with the Dimensional Control Plan is to analyze capability during pre-production and to secure capability in running production

a)

True

b)

False

5.

Gauges should be ready and available to measure parts for delivery to VP MRD

a)

True

b)

False

6.

Dimensional study should be performed with serial tooling by VP event

a)

True

b)

False

7.

Suppliers should have CM4D software installed

a)

True

b)

False

8.

What are PFMEA requirements by VP? Select all applicable.

a)

Open issues have action and time plan

b)

Covers the entire Process Flow

c)

Covers all Special Characteristics in the Special Characteristics Agreements (SCA)

d)

All of above

9.

R@R plan should support:

a)

PV-testing and TT deliveries

b)

TT deliveries

c)

PV-testing, TT-deliveries, geometry verification plan & initial process study

d)

PV-testing

10.

SCA - Stage 2 is agreed by VP

a)

True

b)

False

11.

Process flow, work instructions and control plan for serial production should be available by VP as final version

a)

True

b)

False