WorksheetsAPQP Training - VP Event - Part 1
Total questions: 11
Worksheet time: 6mins
What are the Vehicle Prototype (VP) requirements?, select all applicable.
Confirmation of Tool Readiness
Parts produced from hard tools
SCA stage 1 conducted
DCP confirmed
Parts PO will be released and received before VP build
True
False
What is not a Technical Documentation?
SC-CC / Consequence class defined
Material Specification
DCP
Technical Regulations (TR)
Drawing and Measuring Point (MP) Drawing ready
The objective with the Dimensional Control Plan is to analyze capability during pre-production and to secure capability in running production
True
False
Gauges should be ready and available to measure parts for delivery to VP MRD
True
False
Dimensional study should be performed with serial tooling by VP event
True
False
Suppliers should have CM4D software installed
True
False
What are PFMEA requirements by VP? Select all applicable.
Open issues have action and time plan
Covers the entire Process Flow
Covers all Special Characteristics in the Special Characteristics Agreements (SCA)
All of above
R@R plan should support:
PV-testing and TT deliveries
TT deliveries
PV-testing, TT-deliveries, geometry verification plan & initial process study
PV-testing
SCA - Stage 2 is agreed by VP
True
False
Process flow, work instructions and control plan for serial production should be available by VP as final version
True
False