WorksheetsUnit 1 Review
Total questions: 40
Worksheet time: 20mins
Which of the following is not monitored by a Flow Chart?
Actions
Decisions
Inputs (Queues)
None of these
What do the flow chart component- leaders- show in a flow chart?
A description of an action
The start and end of a process
Direction of Movement
A decision to be made
Rectangles on a flow chart will have information written inside that show:
Brief description of the task to do
Direction of Movement
Where a process starts and ends
Where inputs are taken from or outputs are stockpiled
How many leaders come out of an action box if you do not have a queue?
one
two
three
four
If an engineering starts to make a flow chart, what shape should he/she begin with?
Oval
Rectangle
Diamond
Circle
At least how many leaders come out of a decision?
One
Two
Three
Four
A leader making a decision alone and risking the trust of the team members is what leadership mode?
Averaging
Consensus
Minority
Authority
Which of the following Gantt Chart activities could occur at any point during a project?
Sequential
Parallel
Interdependent
None of these are correct
What are Queues used for in a Flow Chart?
Direction of movement
Where a process starts and ends
Brief description of the task to do
Where inputs are taken from or outputs stockpiled
"Press button" would be something that is put in what flow chart component?
Decision
Action
Queue
When the most votes determines a decision is what mode of leadership?
Majority
Minority
Expert
What does a flow chart do?
Divides tasks to be completed into different categories
Provides technical information and material list for a product
Identifies the people who will complete the different tasks
Takes small processes and compiles them into larger sections
Ovals on a flow chart show:
Where a process starts and ends
Direction of movement
Brief description to the task to do
Indicates a decision to be made
Leadership model in which a leader is positioned closely to all members of the team and has short, direct communication:
Flat
Participative
Traditional
Consultant
Linear activities, or activities that must be done after another is completed, can also be called:
Parallel Activities
Concurrent Activities
Sequential Activities
None of these are correct
True or False: There are parallel activities in this Gantt Chart.
True
False
What should not be compromised when trying to meet standards and deadlines?
Speed
Quality
Both of these
None of these
What is the purpose of a Gantt Chart?
Detail the step-by-step description of how to complete a process
Company lists of who provides products with a cost analysis
Schedule when activities should be completed in a process
Provides technical information and material list for the product
Checking for quality or safety is to be put in what shape?
Diamond
Oval
Arrows
Circles
The leader's role is equal to that of other members when working is what leadership model?
Flat
Consulant
Traditional
When accurate knowledge is obtained from a trusted individual to make a decision, that is an example of what mode?
Expert
Majority
Authority
When a decision is made when every gets to express and hear all viewpoints and is made on common ground is an example of what leadership mode?
Consensus
Averaging
Expert
Authority
Leadership model where a strong leader directs all the actions:
Traditional
Flat
Participative
Consultant
What does EDJ stand for?
Eating Delicious Jelly
Engineering Decoration Journal
Engineering Design Journal
A music DJ named Eric
The means of achieving a desired result is called a what?
Input
System
Feedback
What task is on schedule?
1
2
3
4
True or False: Pages can be removed from the EDJ if there are mistakes.
True
False
Closed Loop Systems are required to have which components?
input, output, feedback
input, output, optimization, outcomes
input, process, output, feedback, optimization
input, process, output, feedback
How many inputs are there in a system?
Three
Seven
Five
Two
One of the forms of inputs, data, are described in the terms of systems as:
Most critical input an engineer has
Ability to control own environment
All of these are correct
Having the ability to control your own environment falls under what input?
Data
Time
Materials
People
This product does not meet the standards of a company but can be repaired so that it will meet the company's standards:
Rework
Rejcet
Accepted
A product that meets standards and is able to move on in assembly is an example of __________.
Rework
Reject
Accepted
This product does not meet the standards of a company and cannot be repaired in any manufacturing process:
Rework
Accepted
Reject
Where do signatures go on an EDJ page?
Top
Left
Bottom
Right
Example outputs are products, structures or services. What else could outputs potentially include?
Feedback for later use
Unwanted outcomes
What task is ahead of schedule
1
2
3
4
Optimization simply stated is:
Means of achieving a desired result
Blend of engineer's best practices
Problem solving and processes
Doing the most with the least
Josh makes a mistake while he is writing testing data. What should he do?
Erase and correct
Strike out the mistake
Remove the page
Tell his friends he is incompetent at writing numbers
True or False: Pictures and documents can be added as long as they are permanently attached.
True
False
