WorksheetsBusiness Continuity
Total questions: 10
Worksheet time: 4mins
May be defined as the identification and protection of critical business processes and resources required to maintain an acceptable level of business, protecting those resources and preparing procedures to ensure the survival of the organization in times of business disruption.
Organizational Change
Business Continuity Plan
Business Plan
Disaster Recovery Plan
A holistic management process that identifies potential threats to an organization and the impacts to business operations that those threats, if realized, might cause, and which provides a framework for building organizational resilience with the capability for an effective response that safeguards the interests of its key stakeholders, reputation, brand and value-creating activities.
Business Continuity Management
Business Impact Analysis
Business Systems
Information Management
A BCP strategy wherein the option is to wait until a disaster happens and hope to acquire equipment and facilities. This may be appropriate where an organization has a recovery time objective permitting restoration of services.
Continuous Processing
Do Nothing
Distributed Processing
Bunker
A ‘____’ site will effectively provide a duplicate facility in another location, with capacity to absorb the additional workload before its absence becomes critical to business survival. Will have all the equipment and facilities required operationally and will simply require installation of systems, applications and data.
Warm
Humid
Hot
Cold
This approach depends on acquiring equipment, software and communications facilities when the disaster occurs. Equipment vendors or disaster recovery service suppliers may guarantee resupply within a specified timeframe in return for a retainer.
Quick Resupply
Stockholding
Retainer
Off-site Storage
The general availability percentage accepted for a data/ system is 95%
True
False
What do you call the Stage 3 Life Cycle of BCP testing and Maintenance?
Plan Audit
Component Testing
Walkthrough
Large Scale Testing
Availability refers to systems that are durable and likely to operate continuously without failure for a long time.
True
False
Below is NOT part of the back-up strategies?
Server Back-up
Tape Back-up
Virtualization
High Availability
Data deduplication is a process that eliminates excessive copies of data and significantly decreases storage capacity requirements
True
False
