As-Built - Knowledge Check

Total questions: 10

Worksheet time: 7mins

Name
Class
Date
1.

Who is responsible for recording as built data in the field?

a)

Chorus

b)

Field Managers

c)

Civil workers

d)

Technicians

e)

Back office workers

2.

Who is responsible for verifying and approving as built drawings?

a)

Chorus

b)

Field Managers

c)

Civil workers

d)

Technicians

e)

Back office workers

3.

A tie-in is...

a)

the distance between the design and the built location

b)

the distance between a landmark and an asset

c)

an inn that serves Thai food

4.

When measuring offsets what landmarks are suitable to use?

a)

a letter box

b)

a boundary marker

c)

a utility pole

d)

a parked car

e)

an existing pit

5.

Tie-ins should be accurate to...

a)

within 1m

b)

within 0.1m

c)

within 300mm

d)

within 1 foot

6.

We only need to record the location, not the depth

a)

TRUE

b)

FALSE

7.

What are consequences of poor as builts?

a)

Contractors dont get paid

b)

Assets get damaged by future works

c)

reputational damage

d)

Time wasted locating later

e)

All of these

8.

Deviations greater than 0._ m need to be recorded

(a)  

9.

As-Built measurements and tie ins should be recorded...

a)

at time of build

b)

at home after work

10.

If there is not much space to add as built drawings on the lay plan you should

a)

leave your phone no so you can explain later

b)

use a fine pencil to draw smaller pictures

c)

draw on a separate sheet with a reference number

d)

draw in an open space with a line pointing to the location