wayground logo

Free Printable Worksheets

Font size

S
M
L
XL
Worksheets

How much Have You Learned?

Total questions: 10

Worksheet time: 5mins

Name
Class
Date
1.

Is a document consisting of a plan and a report, in which the land surveyor describes a property or part of a property.

a)

Lot

b)

Site Plan

c)

Technical Description

d)

Setback

2.

Are directions with reference

to 1 quadrant of the compass.

a)

Metes

b)

Boundaries

c)

Technical Description

d)

Bearings

3.

Are measurements of the boundaries expressed in meters in a Site Plan.

a)

Metes

b)

Boundaries

c)

Technical Description

d)

Bounds

4.

Land surveys begins with monument or starting point known as?

a)

Starting Point

b)

Point of Beginning

c)

North Arrow

d)

Setbacks

5.

A graphical representation indicating the direction of north in an Area.

a)

Setback

b)

Cardinal Directions

c)

North Arrow

d)

Bearings

6.

Also known as the deed of sale which is the property title of a given piece of land with or without a physical structure built on it.

a)

Setbacks

b)

Technical Descriptions

c)

Transfer Certificate of Title

d)

Property line

7.

If the Floor Plan is scaled 1:100, what would be the best scale of the Site plan?

a)

1:100

b)

1:10

c)

1:1000

d)

1:1

8.

In required setbacks, how much is the required open space for an Inside Lot for A occupancies?

a)

5%

b)

10%

c)

20%

d)

30%

9.

In required setbacks, how much open space is required for a corner lot abutting three or more streets, alleys, rivers, etc,?

a)

5%

b)

10%

c)

20%

d)

50%

10.

In setback requirements, how much open space is required for a through lot for A occupancies?

a)

5%

b)

10%

c)

20%

d)

50%