wayground logo

Free Printable Worksheets

Font size

S
M
L
XL
Worksheets

Virtual exSPEdition to MP 2021

Total questions: 8

Worksheet time: 3mins

Name
Class
Date
1.

When is the Mubadala Field on production?

a)

October 2012

b)

September 2013

c)

October 2013

d)

July 2008

2.

What is the biggest subsurface uncertainty in Mubadala Field?

a)

Separation between North West block and Main area

b)

Gas water contact

c)

Aquifer support

d)

Discrete Fracture/Dual Porosity

3.

What is the Gross Heating Value (GHV) of Mubadala Field?

a)

~1000 BTU/ ft3ft^3  

b)

~1500 BTU/ ft3ft^3  

c)

~3000 BTU/ ft3ft^3  

d)

~3200 BTU/ ft3ft^3  

4.

What is the Hydrocarbon in place for Mubadala Field based on P/Z analysis?

a)

~330 BCF

b)

~335 MMBO

c)

~ 1 TCF

d)

~ 110 POD

5.

The chart represents historical and Best Case oil production forecast of Field 'X'. The field started production in 2012; and as of 31 December 2015 is anticipated to produce oil economically until the end of year 2020. The block license is valid until the end of year 2024. Technical Limit for the field is 30Mbopd. Which portion should normally classified as Reserves?

a)

Blue + Red

b)

Red Only

c)

Red + Green

d)

Red + Green + Magenta

6.

What is the English Test Assessment in recruitment in Mubadala?

a)

IELTS

b)

TOEFL

c)

TOEIC

d)

GRE

7.

These are the 'Do's' tips for CV Writing, except

a)

Highlight your skills, achievement, specialties

b)

Simple, communicative, professional email and picture

c)

Long content

d)

Customized CV for different position

8.

The 70:20:10 Learning Model according to the order

a)

On-the-Job Experience; Coaching & Feedback; International Assignment

b)

On-the-Coaching; Project Assignment; Formal Training

c)

On-the-Job Experience; Coaching & Feedback; Formal Training

d)

On-the-Go; Project Assignment; Critical Assignment