1.

Estimating is the process of looking into the future and trying to predict ........ and resource requirements.

a)

project planning

b)

project period

c)

project cost

d)

project circumstances

2.
Constructing a facility in Singapore is very different from constructing one in Perlis. This statement is refer to the project affected.
a)
location
b)
time
c)
cost
d)
labour
3.

The preliminary estimating is useful to the following parties EXCEPT

a)

Client

b)

Architect

c)

Contractor

d)

General Labour

4.

The selection of the method in estimating will depend on....


choose all correct answers

a)

The total and type of cost data available

b)

The experience of Quantity Surveyor

c)

The information and time to prepare the estimate

5.

Is used to estimate the cost where the size depends on the population unit.


The above statement are related to

a)

Unit Valuation Method

b)

Superficial Area Method

c)

Cubic Content Method

d)

Floor Area Method

6.

This method is requires the measurement of length, width and height of the building.


The above statement are related to

a)

Unit Valuation Method

b)

Superficial Area Method

c)

Cubic Content Method

d)

Floor Area Method

7.

By using the cubic content method , find the height of the building in Figure 1

a)

6.50 metre

b)

6.65 metre

c)

6.70 metre

d)

6.75 metre

8.

Estimate the total cost to build a mosque to house a congregation of 1500 individuals.

From a suitable cost data, get the cost/ congregation of a similar mosque that has been updated. Lets us say that the cost is RM 1400.00 / individual

a)

Ringgit Malaysia 21.0 million

b)

Ringgit Malaysia 2.1 million

c)

Ringgit Malaysia 2.11 million

d)

Ringgit Malaysia 2.1 trillion