wayground logo

Free Printable Worksheets

Font size

S
M
L
XL
Worksheets

SPP Documents

Total questions: 40

Worksheet time: 30mins

Name
Class
Date
1.

Is there a possibility that a violator of the Code of Ethical Conduct be charged with both fine and imprisonment?

a)

Yes

b)

No

2.

PRBoA Resolution entitled as the Adoption and Promulgation of the Code of Ethical Conduct for RLAs and holders of Temporary/Special Permits

a)

PRBoA Res. No.3 s2004

b)

PRBoA Res. No.4 s2005

c)

PRBoA Res. No.5 s2005

d)

PRBoA Res. No.2 s2006

3.

When did the 2010 Standards of Professional Practice first took effect?

a)

January 9, 2011

b)

February 21, 2011

c)

March 9, 2011

d)

April 21, 2011

4.

As per SPP Doc 202 Regular Design: project classification of mortuaries

a)

Group 1

b)

Group 2

c)

Group 3

5.

As per SPP Doc 202 Regular Design: project classification of bowlodromes

a)

Group 1

b)

Group 2

c)

Group 3

6.

As per SPP Doc 202 Regular Design: project classification of

Churches and religious facilities

a)

Group 1

b)

Group 2

c)

Group 3

7.

As per SPP Doc 202 Regular Design: project classification of college buildings

a)

Group 1

b)

Group 2

c)

Group 3

8.

As per SPP Doc 202 Regular Design: project classification of printing plants

a)

Group 1

b)

Group 2

c)

Group 3

9.

As per SPP Doc 202 Regular Design: project classification of public markets

a)

Group 1

b)

Group 2

c)

Group 3

10.

As per SPP Doc 202 Regular Design: project classification of observatories

a)

Group 1

b)

Group 2

c)

Group 3

11.

As per 2010 SPP Selection of the Architect: in comparative selection, during the invitation, what document, based on the Design Brief, is prepared by another architect?

a)

Terms of Reference

b)

General Conditions

c)

Notice to Proceed

d)

Breakdown of Work and Corresponding Value

12.

As per SPP Doc 202 Regular Design: minimum no. of storeys of the proposed building by which conducting boring test / soil test is required

a)

2 storeys

b)

3 storeys

c)

4 storeys

d)

5 storeys

13.

As per SPP Doc 202 Regular Design: who shall be responsible for the payment of taxes including VAT that the government may impose on the architect upon rendering his/her services for the project

a)

Architect

b)

Owner

14.

As per SPP Doc 202 Regular Design: per diem + travelling/ living expenses shall be paid by the owner when the architect renders services more than ___ km from his/her office.

a)

50

b)

100

c)

150

d)

200

15.

What services are under SPP Doc. 204-A?

a)

Construction Services

b)

Full-time Construction Services

c)

Construction Management Services

d)

Post Construction Services

16.

As per SPP Doc. 207 DBS: RPF for rendering DBS by Administration based on the PCC

a)

5%

b)

7%

c)

10%

d)

12%

17.

As per SPP Doc. 207 DBS: RPF for rendering DBS on a Guaranteed Maximum Cost based on the PCC

a)

5%

b)

7%

c)

10%

d)

12%

18.

As per 2010 SPP: Dispute Avoidance and Resolution is under what architectural services?

a)

Comprehensive Architectural Services

b)

Specialized Architectural Services

c)

Professional Architectural Consulting Services

d)

Post-Construction Services

19.

VAT for professional services

a)

8%

b)

10%

c)

12%

d)

15%

20.

As per SPP Doc 202 Regular Design: is labor cost included in the Project Construction Cost (PCC)?

a)

Yes

b)

No

c)

It depends

21.

As per SPP Doc 202 Regular Design: are fees for the architect, engineers, and specialist consultants included in the Project Construction Cost (PCC)?

a)

Yes

b)

No

c)

It depends

22.

As per SPP Doc 204-A Full-Time Construction: RPF for full-time construction services

a)

1%

b)

1-1.5%

c)

2%

d)

2-2.5%

23.

As per SPP Doc 205 Post-Con: RPF based on value-pricing (percentage of gross rental)

a)

1-3%

b)

4-6%

c)

2-5%

d)

5-7%

24.

As per SPP Doc 205 Post-Con: usual method of compensation

a)

MDPE

b)

Fixed Fee

c)

Percentage of Construction Cost

d)

Percentage of Gross Rentals

25.

In an ADC, how many of the jurors shall be architects, given that the number of jurors are the maximum allowed as per SPP Doc. 208

a)

3

b)

4

c)

5

d)

6

26.

As per SPP Doc 202 Regular Design: what tax imposed on the architect upon rendering his/her services for the project is not required to be paid by the owner?

a)

VAT

b)

Income Tax

c)

Property Tax

d)

Goods and Services Tax

27.

As per SPP Doc 202 Regular Design: how much (in relation to the service providers fee) is the coordination fee payable to the architect for recommending other service providers?

a)

3%

b)

5%

c)

2.5%

d)

7%

28.

As per 2010 SPP: what are the design phases (in order) stated under Regular Design Services or SPP Doc. 202?

a)

Project Definition Phase, Schematic Design Phase, Contract Document Phase, Design Development Phase, Bidding or Negotiation Phase, and Construction Phase

b)

Project Definition Phase, Schematic Design Phase, Design Development Phase, Bidding or Negotiation Phase, and Construction Phase

c)

Project Definition Phase, Schematic Design Phase, Design Development Phase, Bidding or Negotiation Phase, Contract Document Phase, and Construction Phase

d)

Project Definition Phase, Schematic Design Phase, Design Development Phase, Contract Document Phase, Bidding or Negotiation Phase, and Construction Phase

29.

As per SPP Doc 202 Regular Design: Recommended Professional Fee (RPF) for Group 4 DADS

a)

6%

b)

4.2%

c)

10%

d)

7%

30.

As per 2010 SPP Selection of the Architect: Architectural Design Competition (ADC) is used for what type of projects?

a)

Institutional

b)

Civic/Monumental

c)

Residential

d)

Religious

31.

As per 2010 SPP Selection of the Architect: what type of selection of the architect is used when undertaking a relatively small project?

a)

Direct Selection

b)

Comparative Selection

c)

ADC

32.

As per 2010 SPP: design brief preparation is a scope of what services?

a)

Pre-Design Services

b)

Specialized Architectural Services

c)

PACS

d)

Comprehensive Architectural Services

33.

As per SPP Doc 201 Pre-design: the most common method of compensation for Pre-Design Services

a)

MDPE

b)

Fixed Fee

c)

PCC

d)

Professional Fee + Expenses

34.

As per SPP Doc 201 Pre-design: client shall make progress payments upon request of the architect within how many days from the submission of the statement of account?

a)

7 days

b)

10 days

c)

15 days

d)

5 days

35.

As per SPP Doc 201 Pre-design: printing cost of extra sets of drawings, documents, etc. over the required number of sets is reimbursable. How many sets are required to be submitted to client?

a)

5 sets

b)

6 sets

c)

7 sets

d)

8 sets

36.

As per SPP Doc 201 Pre-design: upon signing of the agreement, the architect shall request for an acceptance fee equivalent to what percent of the agreed Professional Fee?

a)

5%

b)

10%

c)

15%

d)

25%

37.

As per SPP Doc 202 Regular Design: method of compensation used when the scope of services required can be clearly and fully defined at the outset of the project

a)

MDPE

b)

Fixed Fee

c)

PCC

d)

Professional Fee + Expenses

38.

As per SPP Doc 202 Regular Design: project classification of bakeries

a)

Group 1

b)

Group 2

c)

Group 3

d)

Group 4

39.

As per SPP Doc. 209 PACS: after how many days from the day of billing of PCA for his/her services shall he/she be entitled to add interest to the billing?

a)

15 days

b)

30 days

c)

45 days

d)

60 calendar days

40.

As per SPP Doc. 208 ADC: the owner shall not pick portions of ADC entries to compose another plan/design. This is covered under what law also known as the Intellectual Property Code of the Phils.?

a)

RA 9184

b)

RA 8293

c)

PD 223

d)

RA 584