Is there a possibility that a violator of the Code of Ethical Conduct be charged with both fine and imprisonment?
Yes
No
PRBoA Resolution entitled as the Adoption and Promulgation of the Code of Ethical Conduct for RLAs and holders of Temporary/Special Permits
PRBoA Res. No.3 s2004
PRBoA Res. No.4 s2005
PRBoA Res. No.5 s2005
PRBoA Res. No.2 s2006
When did the 2010 Standards of Professional Practice first took effect?
January 9, 2011
February 21, 2011
March 9, 2011
April 21, 2011
As per SPP Doc 202 Regular Design: project classification of mortuaries
Group 1
Group 2
Group 3
As per SPP Doc 202 Regular Design: project classification of bowlodromes
Group 1
Group 2
Group 3
As per SPP Doc 202 Regular Design: project classification of
Churches and religious facilities
Group 1
Group 2
Group 3
As per SPP Doc 202 Regular Design: project classification of college buildings
Group 1
Group 2
Group 3
As per SPP Doc 202 Regular Design: project classification of printing plants
Group 1
Group 2
Group 3
As per SPP Doc 202 Regular Design: project classification of public markets
Group 1
Group 2
Group 3
As per SPP Doc 202 Regular Design: project classification of observatories
Group 1
Group 2
Group 3
As per 2010 SPP Selection of the Architect: in comparative selection, during the invitation, what document, based on the Design Brief, is prepared by another architect?
Terms of Reference
General Conditions
Notice to Proceed
Breakdown of Work and Corresponding Value
As per SPP Doc 202 Regular Design: minimum no. of storeys of the proposed building by which conducting boring test / soil test is required
2 storeys
3 storeys
4 storeys
5 storeys
As per SPP Doc 202 Regular Design: who shall be responsible for the payment of taxes including VAT that the government may impose on the architect upon rendering his/her services for the project
Architect
Owner
As per SPP Doc 202 Regular Design: per diem + travelling/ living expenses shall be paid by the owner when the architect renders services more than ___ km from his/her office.
50
100
150
200
What services are under SPP Doc. 204-A?
Construction Services
Full-time Construction Services
Construction Management Services
Post Construction Services
As per SPP Doc. 207 DBS: RPF for rendering DBS by Administration based on the PCC
5%
7%
10%
12%
As per SPP Doc. 207 DBS: RPF for rendering DBS on a Guaranteed Maximum Cost based on the PCC
5%
7%
10%
12%
As per 2010 SPP: Dispute Avoidance and Resolution is under what architectural services?
Comprehensive Architectural Services
Specialized Architectural Services
Professional Architectural Consulting Services
Post-Construction Services
VAT for professional services
8%
10%
12%
15%
As per SPP Doc 202 Regular Design: is labor cost included in the Project Construction Cost (PCC)?
Yes
No
It depends
As per SPP Doc 202 Regular Design: are fees for the architect, engineers, and specialist consultants included in the Project Construction Cost (PCC)?
Yes
No
It depends
As per SPP Doc 204-A Full-Time Construction: RPF for full-time construction services
1%
1-1.5%
2%
2-2.5%
As per SPP Doc 205 Post-Con: RPF based on value-pricing (percentage of gross rental)
1-3%
4-6%
2-5%
5-7%
As per SPP Doc 205 Post-Con: usual method of compensation
MDPE
Fixed Fee
Percentage of Construction Cost
Percentage of Gross Rentals
In an ADC, how many of the jurors shall be architects, given that the number of jurors are the maximum allowed as per SPP Doc. 208
3
4
5
6
As per SPP Doc 202 Regular Design: what tax imposed on the architect upon rendering his/her services for the project is not required to be paid by the owner?
VAT
Income Tax
Property Tax
Goods and Services Tax
As per SPP Doc 202 Regular Design: how much (in relation to the service providers fee) is the coordination fee payable to the architect for recommending other service providers?
3%
5%
2.5%
7%
As per 2010 SPP: what are the design phases (in order) stated under Regular Design Services or SPP Doc. 202?
Project Definition Phase, Schematic Design Phase, Contract Document Phase, Design Development Phase, Bidding or Negotiation Phase, and Construction Phase
Project Definition Phase, Schematic Design Phase, Design Development Phase, Bidding or Negotiation Phase, and Construction Phase
Project Definition Phase, Schematic Design Phase, Design Development Phase, Bidding or Negotiation Phase, Contract Document Phase, and Construction Phase
Project Definition Phase, Schematic Design Phase, Design Development Phase, Contract Document Phase, Bidding or Negotiation Phase, and Construction Phase
As per SPP Doc 202 Regular Design: Recommended Professional Fee (RPF) for Group 4 DADS
6%
4.2%
10%
7%
As per 2010 SPP Selection of the Architect: Architectural Design Competition (ADC) is used for what type of projects?
Institutional
Civic/Monumental
Residential
Religious
As per 2010 SPP Selection of the Architect: what type of selection of the architect is used when undertaking a relatively small project?
Direct Selection
Comparative Selection
ADC
As per 2010 SPP: design brief preparation is a scope of what services?
Pre-Design Services
Specialized Architectural Services
PACS
Comprehensive Architectural Services
As per SPP Doc 201 Pre-design: the most common method of compensation for Pre-Design Services
MDPE
Fixed Fee
PCC
Professional Fee + Expenses
As per SPP Doc 201 Pre-design: client shall make progress payments upon request of the architect within how many days from the submission of the statement of account?
7 days
10 days
15 days
5 days
As per SPP Doc 201 Pre-design: printing cost of extra sets of drawings, documents, etc. over the required number of sets is reimbursable. How many sets are required to be submitted to client?
5 sets
6 sets
7 sets
8 sets
As per SPP Doc 201 Pre-design: upon signing of the agreement, the architect shall request for an acceptance fee equivalent to what percent of the agreed Professional Fee?
5%
10%
15%
25%
As per SPP Doc 202 Regular Design: method of compensation used when the scope of services required can be clearly and fully defined at the outset of the project
MDPE
Fixed Fee
PCC
Professional Fee + Expenses
As per SPP Doc 202 Regular Design: project classification of bakeries
Group 1
Group 2
Group 3
Group 4
As per SPP Doc. 209 PACS: after how many days from the day of billing of PCA for his/her services shall he/she be entitled to add interest to the billing?
15 days
30 days
45 days
60 calendar days
As per SPP Doc. 208 ADC: the owner shall not pick portions of ADC entries to compose another plan/design. This is covered under what law also known as the Intellectual Property Code of the Phils.?
RA 9184
RA 8293
PD 223