_______ is the penalty for unpaid due Professional fee within the contract time.
Interest Payment
Penalty
Liquidated damages
Surcharge
It is the instructions that supplements or modify drawings, specs. & general conditions of the contract.
Special provisions
Supplementary specs
Drawings
Specifications
Architecture graduates can take the Board Exam conditionally after the board exam.
True
False
Maybe
In some occasion
The UAP can revoke any professional license for a cause.
True
False
Maybe
In some occasion
The __________ is the main focus of Architect's services.
Design Services
Billing
Construction
Design & Build
A compensation type is based on technical hours expended by consultants, technical staff, and architects.
Professional fee plus expenses
% of construction cost
Multiple of direct personnel expense
Fixed fee
Programming is under the ________ services of an architect.
Construction
Pre-design
Post-construction
Specialized Architectural services
If the block exceeds 250 meters, __________ will be provided at the midlength of the block.
Curve
Alley
Carriage way
Drainage
What does SPP 201 discusses about?
Post - construction services
Specialized Architectural services
Professional Architectural consulting Services
Pre-Design services
Building administrators are compensated based on.
Lump sum
% of construction cost
% of income
% of gross monthly rentals