WorksheetsPermit To Work
Total questions: 10
Worksheet time: 6mins
Based on PTW, what is High Voltage and Low Voltage meaning?
HV > 1000 VDC
HV > 1000 VAC
LV < 1500 VDC
LV < 1500 VAC
What is the fundamental differences between Hazard and Risk?
Injury
Dangerous
Likelihood / Exposure
Harm
Why there's RIC, SL, IO, PIC and Isolator in JSP PTW?
Duty Segregation
Double Checker
Longer Time
Different Hazard/Risk
When we open Maximo, what is the type of permit which not included as specific permit?
Access Permit
Confined Space Permit
Hot work Permit
Conditional Access Permit
"Add watch step sign in PTW work area", what is the control hierarchy of that control measure?
PPE
Administration
Awareness
Isolation
When make Permit Application, what is column which SHALL be filled by RIC?
Tag Number
PTW Number
Work Timing
Work Order Number
Method of work
When Emergency cases happen, who shall direct the work to handle the cases?
Level 4 Person
Unit Controller
Level 4 which assigned by Shift Leader
Shift Leader
When Work Live Apparatus in Low Voltage shall be occurred, who shall give approval?
Electrical Engineer
EIC Leader
HSE Officer
Shift Leader
Electrical leader
How long validity period of the Permit to Work?
10 Days Maximum
7 Days
1 Month
30 Days
What Level which able to make PTW
LEVEL 1 - Recipient in Charge
LEVEL 2 - Issuing Officer
LEVEL 3 - HV Operator
LEVEL 4 - Grounding Supervisor