wayground logo

Free Printable Worksheets

Font size

S
M
L
XL
Worksheets

Occupational health and safety procedures

Total questions: 20

Worksheet time: 10mins

Name
Class
Date
1.

Below are topics for occupational health and safety procedures, except?

a)

Rescue boat maintenance

b)

Lifting technique

c)

Chemical and biohazard safety

d)

Electrical safety

2.

Which of the following is used to safely withdraw the crew that got electric shock?

a)

Insulating glove

b)

Insulated rescue hook

c)

Voltage detector

d)

Glove storage bag

3.

Which of the following is a wrong practice?

a)

Never leave the loose wire without proper insulation

b)

Switch off the power supply before do the maintenance

c)

Use rubber floor mat to avoid current flow

d)

Use fire hose when there is electrical fire

4.

What is LOTO?

a)

Look Out Tag Out

b)

Lock Out Tag Out

c)

Look Out Tool Out

d)

Lock Out Tool Out

5.

Above is one of the electrical part and equipment. What is the name of the equipment?

a)

Main switchboard

b)

Transformer

c)

Relay

d)

Megger test

6.

After finish some maintenance, we need to make sure that we return the tool at the correct place. Why?

a)

Easy us for the next usage

b)

Captain standing instruction

c)

Audit domestic inquiries.

d)

To change with new one

7.

Below are procedure before start the mechanical work, except?

a)

Have a toolbox meeting

b)

Discuss on specific job

c)

Prepare yourself with PPE

d)

Ignore essential instruction from chief engineer

8.

Which of the following job do not required PTW when working?

a)

Update inventory in store

b)

Change bulb at monkey island

c)

Welding bracket on main deck

d)

Tank cleaning

9.

Which activity required electrical PTW?

a)

Change relay in switchboard

b)

Unplug the socket from extension wire

c)

Maintenance on transformer

d)

Dismantle the damage food grinder

10.

Which of the following present in PTW form?

a)

Date and time issue

b)

Work location

c)

Description of work

d)

Details of emergency procedure

11.

At what height the crew considered as working aloft and required safety harness.

a)

1 m

b)

2 m

c)

3 m

d)

4m

12.

How tight we should wear the safety harness?

a)

Until we can fill very tight

b)

Can put a 1.5L bottle at strap

c)

As loose as we feel comfortable

d)

Can put a flat hand at strap

13.

Which of the following is/are true about enclosed space?

a)

Limited opening for entry and exit

b)

Inadequate ventilation

c)

Not designated for continuous worker occupancy

d)

Does not required PTW to enter

14.

Which of the following cannot be done when dealing with enclosed space?

a)

Straight away enter tank after opening the manhole

b)

Ensure adequate lighting

c)

Fill the risk assessment form before enter enclosed space

d)

Inform duty officer

15.

Which of the following is gantry crane?

a)
b)
c)
d)
16.

Which is the correct flow for proper lifting technique?


A) Look ahead, keep back straight, chest out

B) Slowly lift up using hips and knee

C) Keep the load close to body and take a small step

D) Keep wide base, squat down

a)

A, B, D, C

b)

D, C, B, A

c)

C, B, A, D

d)

D, A, B, C

17.

What is meant by this signage?

a)

Corrosive

b)

Flammable

c)

Oxidizing agent

d)

Toxic

18.

Which of the following are the effect of chemical hazard?

a)

Cause a serious disease

b)

Bodily injured

c)

Decrease lifespan (age)

d)

Effect on mental illness

19.

Which of the following is the correct method for chemical handling?

a)

Carefully read the ingredient list

b)

Use proper PPE

c)

Do not mix the chemical

d)

Always wash your hand after usage of chemical

20.

Which of the following is the glove for a welding job?

a)
b)
c)
d)