1.

What is Republic Act 9184?

a)

Government Procurement Policy Board

b)

Government Procurement Reform Act

c)

Government Planning Reform Act

d)

Government Procurement Policy Organization

2.

_________ should meet public needs, secure value for money for the people, and be fair to bidders

a)

Bids and Awards Committee

b)

Good Procurement

c)

Technical Working Group

d)

Procurement

3.

These are the 5 Core Principles of Public Procurement

a)

Public Monitoring, Accountability, Competition, Transparency, Streamlined Process

b)

Public Monitoring, Activity, Competition, Transparency, Streamlined Process

c)

Public Advantage and Monitoring, Accountability, Competition, Transparency, Streamlined Process

d)

Public Advantage and Monitoring, Accountability, Competitiveness, Transparency, Streamlined Process

4.

_______ is the Process Owner

a)

BAC

b)

TWG / Consultants

c)

End-Users

d)

HoPE

5.

The minimum composition of BAC members is ____

a)

4

b)

5

c)

6

d)

7

6.

BAC members should occupy _____ position

a)

Job Order

b)

Cost of Service

c)

Plantilla

d)

Outsourced

7.

Who is not prohibited to be a BAC member?

a)

HoPE

b)

End-user unit Representative

c)

Chief Accountant

d)

Approving Official

8.

What is not the new authority of BAC?

a)

Power to invite observers during eligibility checking

b)

Power to allow submission and acceptance of alternate documents

c)

Power to toll or suspend the running of mandatory period

d)

Power to cancel, terminate, and declare a failure of bidding

9.

_____ is the panel of experts

a)

HoPE

b)

End-User

c)

BAC

d)

TWG

10.

_______ is the process enabler

a)

BAC

b)

HoPE

c)

BAC Secretariat

d)

TWG

11.

_____ is the Process Inspector

a)

BAC Secretariat

b)

Observer

c)

End-User

d)

HoPE

12.

Capacitate before you ______

a)

assign

b)

act

c)

delegate

d)

inform

13.

What is proper planning prevents poor procurement, results in best project at the lowest possible?

a)

Procurement preparation

b)

Procurement proper

c)

Procurement planning

d)

Procurement projects

14.

No APP, No Budget

No Budget, No _______

a)

Purchase

b)

Planning

c)

Procurement

d)

Preparation

15.

________ is the description of the functions for which the Goods or Services are to be utilized.

a)

Performance Description

b)

Functional Description

c)

Environmental Interface

d)

Design

16.

_______ refers to the environment in which the required functions are performed at the desired level.

a)

Performance Description

b)

Functional Description

c)

Environmental Interface

d)

Design

17.

______ refers to the manner that the Goods are required to perform the functions expected of them or performance standards required for services.

a)

Functional Description

b)

Performance Description

c)

Environmental Interface

d)

Design

18.

_____ refers to the technical design, design standard or drawing of the goods being procured. Particularly useful where the goods are specially manufactured for the PE.

a)

Functional Description

b)

Performance Description

c)

Environmental Interface

d)

Design

19.

______ is document that reflects the status of all procurement activities specified in the APP undertaken by the PE, whether on-going, completed, or not yet started.

a)

Procurement Mentoring Report

b)

Procurement Monitoring Report

c)

Procurement Management Report

d)

Procurement Mandate Report

20.

The ______ is the standard procurement monitoring, assessment and evaluation tool for all PEs, to determine, in a qualitative and quantitative manner, a PE's procurement strengths and weaknesses and to:

a)

Agency Procurement Compliance and Performance Indicator (APCPI) System

b)

Agency Procurement Compliance and Performance Indicator (APCPI) Pillars

c)

Agency Procurement Compliance and Performance Indicator (APCPI) Tools

d)

Agency Procurement Compliance and Performance Indicator (APCPI) Design

21.

What is PBD?

a)

Procurement Bidding Documents

b)

Planning Bidding Documents

c)

Philippine Bidding Documents

d)

Process Bidding Documents

22.

What is the latest edition of PBD?

a)

3rd

b)

4th

c)

5th

d)

6th

23.

The PBD 6th Edition forces the Procurement Organizations, Bidders, and Interested Stakeholders to ______ themselves on the GPPB Resolutions, Circulars, and GPPB-TSO Advisories, Opinions, and FAQs

a)

regularly monitor

b)

regularly check

c)

regularly update

d)

regularly assess

24.

Who prepared PMR?

a)

HoPE

b)

End-User

c)

BAC

d)

TWG

25.

What is the nickname of Atty. Zoilo?

a)

Atty. Pogi

b)

Atty. Jr.

c)

Atty. Boy

d)

Atty. Boyet