Font size
WorksheetsRIBA POW Multi choice
Total questions: 20
Worksheet time: 11mins
What is stage 0 in the 2020 RIBA POW?
Strategic Definition
Strategy Defined
Inception
First Contact
What is stage 1 in the 2020 RIBA POW?
Strategic Definition
Client Briefing
Preparation and Briefing
Initial Ideas Stage
What is stage 2 in the 2020 RIBA POW?
Concept
Concept Design
Spatial Coordination
Technical Design
What is stage 3 in the 2020 RIBA POW?
Strategic Brief
Spatial Planning
Preparation and Brief
Spatial Coordination
What is stage 4 in the 2020 RIBA POW?
Spatial Planning
Technical Design
Handover
Concept Design
What is stage 5 in the 2020 RIBA POW?
Possession of site and construction
Constrcution
Manufacturing and Construction
Handover
What is stage 6 in the 2020 RIBA POW?
Close out
Snagging
Final Construction
Handover
What is stage 7 in the 2020 RIBA POW?
Use
In Use
User Feedback
Review
What stage might you expect to see this drawing?
Stage 0
Stage 1
Stage 2
Stage 3
At what stage might you see this type of drawing?
Stage 2
Stage 3
Stage 4
Stage 5
At what stage would you expect to see this type of drawing?
Stage 7
Stage 6
Stage 5
Stage 4
At what stage is this site photo taken?
Stage 4
Stage 5
Stage 6
Stage 7
What activities are most likely to be undertaken at Stage 0?
Deciding on what type of material should be used on the exterior of the building.
Determining how much the project will cost the client
Talking to the client and deciding whether the practice can take on the job and who might be the job runner.
Creating quick sketches of what might be possible.
What activities are most likely to be undertaken at Stage 1?
Determinging who will be doing what by what date.
Getting best prices on materials to be used on the project.
Get a better understanding for what the client wants and if the budget they have will be enough, who will be doing what in the practice.
Do a historic study of the site to determine what sort of building might be appropriate in the location.
What activities are most likely to be undertaken at Stage 2?
Create some ideas for the site that fit in with desk top and site surveys.
Develop an outline of the building with dimensions and materials
Develp a better understanding of what the client wants with regards to foundations.
Draw technical details for the key junctions for the building.
What activities are most likely to be undertaken at Stage 3? (pick two)
Submit Drawings to Development Control
Submit drawings to Building Control.
Draw technical drawings that have specification and details that show how the building will be constructed.
Draw plans and elevations that show how everything will be set out to accommodate furniture and internal activities.
What activities are most likely to be undertaken at Stage 4? (pick two)
Submit Drawings to Development Control
Submit drawings to Building Control.
Draw technical drawings that have specification and details that show how the building will be constructed.
Draw plans and elevations that show how everything will be set out to accommodate furniture and internal activities.
What activities are most likely to be undertaken at Stage 5?
Technical Drawings; detail, specification, assembly, detailed sections, engineer's calculations.
Design Drawings; plans, sections, elevations, 3D views, internal elevations
Clear site, set out foundations, lay services, concrete pours, build outer shell, doors, windows, roof.
Completion of health and safety file, maintenance schedules, warrenties for building services.
What is the RIBA POW?
A list of things to do to construct a building
A set of things that must be done on every job to make sure everything has been done properly.
A detailed set of notes that identify what might need to be done at the various stages of a design and construction project.
Legislation that, if followed will ensure that you are protected from going to court if anything goes wrong.
What type of drawing is this?
An elevation drawing
An outline drawing
A floor plan
Concept sketches
