WorksheetsSTUDY TIME
Total questions: 11
Worksheet time: 11mins
Excavation near high pressure is ?
5ft
10ft
6ft
15ft
Boring near any SWG Facility what is the standby
10ft
15ft
5ft
6ft
Buried facilities can be manually exposed using the following methods
Hand dig
Utilivac
soil pick / air spade
all of the above
Early warning signs during excavation includes
change in material [ sand sift ]
blue warning tape above facility
underground wire
none of the above
extreme ground conditions include
roots
soft clay
Damage must be reported when the following occurs
ANY DAMAGE
just a scratch
leak
Locators only use the following facilities for reference and they should not be used as landmarks for line locating purposes because they are posted without dimensions
Anodes
Test stations
couplings
When marking a gas facility at a street crossing locators place marks
on both sides of the street
one in the middle
every 50ft as necessary
The company's trouble locate procedures for line locates are to
identify
report
document
other
Markings on permanent surfaces can never exceed a spacing of
50ft
10ft
5ft
15ft
if inaccurate line markings are found on the job site do you paint over it with a appropriate color paint?
yes
no