wayground logo

Free Printable Worksheets

NEW

Font size

S
M
L
XL
Worksheets

OnShape: Knowledge Base

Total questions: 30

Worksheet time: 8hrs 30mins

Name
Class
Date
1.

Part Sketches can be used for mate relationships in assemblies.

a)

True

b)

False

2.

Dashed line types shows there are multiple edges stacked in the drawing.

a)

True

b)

False

3.

Each drawing sheet represents a new unique part.

a)

True

b)

False

4.

A "+" on the drawing is always the center of an arc or circle.

a)

True

b)

False

5.

A part dimensioned "0.500" has the same acceptable deviation as a part dimensioned "0.5".

a)

True

b)

False

6.

Tolerances in the title block over-ride a dimension's tolerances.

a)

True

b)

False

7.

Part numbers and descriptions help identify the part in the drawing.

a)

True

b)

False

8.

Individual view scales always match the sheet scale.

a)

True

b)

False

9.

Assembly items can be pulled from multiple documents and standard content.

a)

True

b)

False

10.

Best practice is to copy documents then merge parts together when multiple users need to work on the same document.

a)

True

b)

False

11.

When adding a mate, using rotate ____________.

a)

flips one primary axis direction

b)

allows the mate to move

c)

changes the view window 90°

d)

rotates about the mate's primary axis

12.

For parts split into two pieces best practice is to __________.

a)

move parts to an assembly

b)

create a composite part

c)

detail the parts separately

d)

leave the parts connected by a tiny sliver

13.

__________ designate a reference dimension.

a)

Italics

b)

Underline

c)

Parentheses

d)

Pulling the dimension far away

14.

The ______ symbol represents a counterbore.

a)

b)

c)

d)

15.

When a 12in long part is scaled 1:4, it appears to be ___in long on the paper.

a)

48

b)

12

c)

3

d)

4

16.

What symbol represents a diameter?

a)

f

b)

Ø

c)

R

d)

17.

What balloon symbol is associated with a Bill of Materials Line?

a)

Triangle

b)

Square

c)

Circle

d)

Diamond

18.

A projected view has an associated ___________ view.

a)

parent

b)

master

c)

dominant

d)

king

19.

When detailing a symmetric part that is not a revolved piece what line shows the part is symmetric.

a)

_ _ _ _ _ _ _ _

b)

. . . . . . . . . . . . .

c)

_______________________

d)

_____ _ ______ _ _______

20.

What is the most important part of a revision block?

a)

Who changed it.

b)

When it was changed.

c)

How many changes occurred.

d)

Description of the changes.

21.

A ______ view type is based on an imaginary cut across the part.

a)

section

b)

crop

c)

break

d)

projected

22.

When a small piece of information needs to be shown close up, a ____ view is best.

a)

detail

b)

projected

c)

section

d)

break

23.

A bill of material is typically found _________.

a)

on a part drawing

b)

only in manufacturing software

c)

on an assembly drawing

d)

foundry invoice

24.

Dashed lines on an assembly drawing are called _________ lines.

a)

explode

b)

screw

c)

fit

d)

quantity

25.

A drawing view normal to an angled faces is called a(n) _____ view.

a)

face

b)

side-on

c)

auxiliary

d)

detail

26.

Using the ________ feature can shorten long sections in a drawing view.

a)

screw

b)

split

c)

shorten

d)

break

27.

In order to save a design state, it's best practice to _______.

a)

create a version

b)

copy the document

c)

copy the part studio

d)

export the document to store locally

28.

Which of the following is not a tab type found in Onshape?

a)

Assembly

b)

Part Studio

c)

Document

d)

Drawing

29.

When a document is shared, the third party has access to ____________ within the document

a)

drawings

b)

part studios

c)

assemblies

d)

all tabs

30.

What can you NOT view in Follow mode?

a)

Drawings

b)

Assemblies

c)

Part Studios

d)

Old drawings