wayground logo

Free Printable Worksheets

NEW

Font size

S
M
L
XL
Worksheets

CI - Assessment(White Belt and DMAIC)

Total questions: 15

Worksheet time: 8mins

Name
Class
Date
1.

What is the main focus of Lean?

a)

organization

b)

efficiency

c)

planning

d)

regulation

2.

_________ indicates the quality of a process.

a)

KPI

b)

measurement

c)

chart

d)

diagram

3.

The following CI Trainings are conducted by CI Coordinators except:

a)

CI Global Sharepoint Training

b)

White Belt Training

c)

DMAIC crash course

d)

Yellow Belt Training

4.

In the DMAIC cycle, this phase answers the question - How big is the problem?

a)

define

b)

analyze

c)

measure

d)

improve

5.

SIPOC stands for:

a)

Suppliers, Inputs, Process, Outputs, Customers

b)

Suppliers, Inputs, Power, Outputs, Customers

c)

Standards, Inputs, Process, Outputs, Customers

d)

Suppliers, Inputs, Process, Outputs, Construction

6.

To qualify for the Lean Six Sigma Yellow Belt Program, the required FTE savings is:

a)

.25

b)

0.3

c)

0.2

d)

0.15

7.

The following are project criteria worthy of a Lean Six Sigma project except:

a)

Solutions are unknown

b)

.25 fte savings

c)

based on quantifiable metrics

d)

Solutions are known

8.

DMAIC stands for?

a)

Describe, Measure, Analyze, Improve, Control

b)

Define, Measure, Analyze, Improve, Construction

c)

Define, Measure, Analyze, Improve, Control

d)

Define, maneuver, Analyze, Improve, Control

9.

True or False: In the CI SharePoint Tool, put the group code number in “what was the solution” field.

a)

TRUE

b)

FALSE

10.

In the Ease and Impact Matrix, what solutions should you prioritize?

a)

Quick wins

b)

Fill Ins

c)

Major Projects

d)

Yellow Belt Project

11.

Which of the following DMAIC Course defines: "How big is the problem?"

a)

Define

b)

Analyze

c)

Measure

d)

Control

12.

Which of the following DMAIC Course defines: "What is the problem?"

a)

Measure

b)

Analyze

c)

Control

d)

Define

13.

This type of improvement should be selected in the CI SharePoint Tool when there is cost avoidance or cash saving generation directly impacting BU or functions.

a)

FTE Savings

b)

Automation

c)

Stakeholder impact

d)

Major Projects

14.

Which of the following DMAIC Course defines: "What are the root causes of the problem?"

a)

Analyze

b)

Measure

c)

Define

d)

Control

15.

Which of the following DMAIC Course defines: "How to sustain improvements?"

a)

Define

b)

Measure

c)

Analyze

d)

Control