Technomatic - Manual Testing - Part 2

Total questions: 10

Worksheet time: 6mins

Name
Class
Date
1.

STLC stands for ?

a)

Software Testing Life cycle

b)

Software Development Life cycle

c)

Software Life Cycle

d)

None of the above

2.

When an expected result is not specified in test case template then

a)

We cannot run the test

b)

It may be difficult to repeat the test.

c)

It may be difficult to determine if the test has passed or failed.

d)

Nothing will happen

3.

Which testing is performed immediately once a build is deployed ?

a)

Integration Testing

b)

Smoke Testing

c)

System Testing

d)

Performance Testing

4.

One test scenario can have multiple test cases ?

a)
b)
5.

What happens if we don't have a test plan

a)

Can't deliver the results in time

b)

Testing might not be efficient

c)

Roles & Responsibilities might not be clear

d)

All the above

6.

Who prepares the Test Plan

a)

Test Manager

b)

Client

c)

Test Engineer

d)

Business Analyst

7.

Discussing the client expectations and clarifying the queries from technical team will happen in which phase

a)

Test Design

b)

Requirement Analysis

c)

Test Execution

d)

Test Plan

8.

If I am not clear on any business requirement, can I test the application with my own assumption.

[Select all that apply]

a)

Testing should not be done with assumption

b)

It's Ok

c)

Assumption may lead severe bugs in the later stage

d)

Assumption brings up added advantage

9.

What kind of applications can be tested ?

a)

Window applications

b)

Web Appications

c)

API

d)

Database

10.

In which stage you will find bugs

a)

Requirement Analysis

b)

Test Plan

c)

Test Designn

d)

Test Execution