1.

This does not include any of the fees for the architect, engineer and specialist consultants or the salaries of the construction inspectors.

a)

Salary cost

b)

Project construction cost

c)

Project development cost

d)

Reimbursables

2.

This includes the cost of the construction as well as all professional fees, permits, clearances, and utilities and cost of acquiring the project site, cost of money, etc.

a)

Reimbursables

b)

Project construction cost

c)

Project development cost

d)

Salary cost

3.

Library and periodical expenses and other means of keeping abreast with new developments and technologies and business development expenses fall under which?

a)

Reimbursables

b)

Cost of Work

c)

Overhead

d)

Direct personnel cost

4.

The total cost considering the rate of the Architect, the Consultants, Technical Staff, Researchers, and others involved in the Project per hour (man-hours), per day, or per month.

a)

Reimbursables

b)

Overhead

c)

Cost of work

d)

Direct personnel cost

5.

The total cost of all fixtures and accessories for architectural interiors, acoustics, lighting works, site development civil works and landscaping works which were either designed, specified, or procured by the Specialist Consultants.

a)

Reimbursables

b)

Cost of work

c)

Overhead

d)

Direct of personnel cost

6.

Xyladecor is a product of?

a)

Pacific Paint

b)

Davies

c)

Dutchboy

d)

Titan

7.

Means "fired earth" a clay product which has been used for architectural decorative purposes.

a)

Terra Cotta

b)

Brick

c)

Granite

d)

Marble

8.

Unit of deformation of a material subjected to an applied load.

a)

stress

b)

strain

c)

elastic limit

d)

intensity

9.

Accommodate expansion due to change in temperature

a)

cold joint

b)

expansion joint

c)

construction joint

d)

transverse joint

10.

Plane of weakness or discontinuity formed when a batch of concrete hardens before the next batch is placed against it.

a)

expansion joint

b)

cold joint

c)

construction joint

d)

transverse joint

11.

Join concrete that is paved at different times

a)

expansion joint

b)

cold joint

c)

construction joint

d)

transverse joint

12.

Necessary at the end of paving segment or at a placement interruption for a driveway, cross road or bridge.

a)

cold joint

b)

expansion joint

c)

construction joint

d)

transverse joint

13.

Join lanes that are paved at different ties or join through lanes to curb & gutter or auxillary lanes.

a)

expansion joint

b)

cold joint

c)

transverse joint

d)

longitudinal construction joint

14.

FALAR 1

a)

Fire Safety Compliance Report

b)

Fire Safety Compliance and Commissioning Report

c)

Fire Safety Maintenance Report

15.

FALAR 2

a)

Fire Safety Compliance Report

b)

Fire Safety Compliance and Commissioning Report

c)

Fire Safety Maintenance

Report

16.

FALAR 3

a)

Fire Safety Compliance Report

b)

Fire Safety Compliance and Commissioning Report

c)

Fire Safety Maintenance Report

17.

Tallest building in the Philippines

a)

Grand Hyatt Manila

b)

PBCOM Tower

c)

Trump Tower Manila

d)

Gramercy Residences

18.

Forms as a doorway to the chamber

a)

Portal tombs

b)

Passage tombs

c)

Wedge tomb

19.

Character of Egyptian Architecture

a)

-simplicity

-massiveness

-monumentality

b)

-massiveness

-grandeur

-monumentality

c)

-light

-airy

-magnificence

d)

-simplicity and harmony

-purity of line

perfection of

-proportions

refinement of details

20.

Longest Gothic cathedral in Europe

a)

Westminster Abbey

b)

York Cathedral

c)

Winchester Cathedral

21.

10th tallest building in the world

a)

TAIPEI 101

b)

CITIC Tower

c)

Tianjin CTF Finance Centre

d)

Guangzhou CTF Finance Center

22.

9th tallest building in the world

a)

Guangzhou CTF Finance Center

b)

Tianjin CTF Finance Centre

c)

CITIC Tower

d)

TAIPEI 101

23.

8th tallest building in the world

a)

TAIPEI 101

b)

CITIC Tower

c)

Tianjin CTF Finance Centre

d)

Guangzhou CTF Finance Center

24.

7th tallest building in the world

a)

Guangzhou CTF Finance Center

b)

Tianjin CTF Finance Centre

c)

CITIC Tower

d)

TAIPEI 101

25.

6th tallest building in the world

a)

One World Trade Center

b)

Lotte World Tower

c)

Citic Tower

d)

Ping An Finance Center

26.

5th tallest building in the world

a)

Lotte World Tower

b)

One World Trade Center

c)

Shanghai Tower

d)

Ping An Finance Center

27.

4th tallest building in the world

a)

Ping An Finance Center

b)

Makkah Royal Clock Tower

c)

Taipei 101

d)

Lotte World Tower

28.

3rd tallest building in the world

a)

Makkah Royal Clock Tower

b)

Shanghai Tower

c)

Burj Khalifa

d)

One World Trade Center

29.

2nd tallest building in the world

a)

Burj Khalifa

b)

Shanghai Tower

c)

Makkah Royal Clock Tower

d)

Ping An Finance Center

30.

The tallest building in the world

a)

Burj Khalifa

b)

Shanghai Tower

c)

Makkah Royal Clock Tower

d)

Ping An Finance Center

31.

SPI Codes

a)

Polyethylene Terephthalate

b)

Polypropylene

c)

Polystyrene

d)

Polyvinyl

32.

Number of tiles per box:

20 x 20

a)

25 pcs.

b)

11 pcs.

c)

24 pcs.

d)

20 pcs.

33.

Number of tiles per box:

30 x 30

a)

25 pcs.

b)

11 pcs.

c)

24 pcs.

d)

20 pcs.

34.

Number of tiles per box:

40 x 40

a)

9 pcs.

b)

6 pcs.

c)

12 pcs.

d)

11 pcs.

35.

Number of tiles per box:

60 x 60

a)

6pcs.

b)

4pcs.

c)

5pcs.

d)

3pcs.