The committee assigned to formulate the UAP Documents.
UAP Committee on Professional Practice
UAP Committee on Professional Practice & Ethics
UAP Committee on Standards on Professional Practice
None of the Above
The Contract consists of the following documents, including all additions, deletions and modification incorporated therein before the execution of the Contract, except?
Drawings
Special Provisions
Technical Specifications
None of the Above
Theses are prepared to provide consistency and to instruct construction contractors on how the works are to be carried out, the quality of the workmanship and methods of quality assurance for the construction.
Drawings
General Conditions
Technical Specifications
Outline Specifications
It is a brief description of the main components to be used in construction. They should be described in sufficient detail to allow the cost consultant to prepare some approximate quantities.
Drawings
Special Provisions
Technical Specifications
Outline Specifications
Are instructions which may be issued prior to the bidding to supplement and/or modify the drawings, specifications, and/or General Conditions of the contract.
Drawings
Special Provisions
Specifications
General Conditions
It is any "lesser" criminal act in some common law legal systems.
Criminal Crime
Misdemeanor
Violence
Misdimeanor
This word shall be understood to mean “furnish and install”
Build
Provide
Complete
Work
Names of proposed manufacturers, material men, and dealers who are to furnish materials, fixtures, appliances or other fittings shall be not be submitted to the Architect to avoid biases and business conflict.
True
False
Maybe
I don't care
The Owner shall furnish the contractor free of charge ? set/s of drawings and specifications.
Seven
Five
Three
One
Contractor shall prepare at his own expense and submit ? copies of all shop drawings to the architect, who will make the necessary corrections, and file the corrected copies.
Three
Two
One
None
Contractor shall prepare at his own expense and submit ? copies of all shop drawings to the architect, who will make the necessary corrections, and file the corrected copies.
Three
Two
One
None
Does the Contractor have the right to suspend or terminate the contract?
Yes
No, only the Owner can
Yes but it should have a written notice
Maybe if the owner agrees
Discrepancies between the drawing and the built project are found after the project is finished. The owner did not like it and trying to find out who is to blame. Whose fault was it?
Architect
Contractor
Owner
All of the above
All additional detail drawings and instructions essential to the proper execution of the work shall be furnished from time to time. Whose responsibility is this?
Architect
Contractor
Owner
Both A and C
Shall prepare a schedule, subject to change from time to time in accordance with the progress of the work, fixing dates at which the various detail drawings will be required.
Architect
Contractor
Owner
Both A and B
Who is responsible if construction starts without necessary permits?
Architect
Contractor
Owner
All of the Above
Who is responsible for establishment of boundaries made by a licensed surveyor?
Architect
Contractor
Owner
All of the Above
Transportation charges for material/equipment samples must be prepaid by whom?
Architect
Contractor
Owner
All of the Above
No substitution for materials be made without owner’s approval.
Yes, true
No, It should be the Architect's apporval
Any will do
I don't care
Who shall approve the temporary signs on site?
Architect
Contractor
Owner
All of the Above
The supervisor must be a licensed engineer or architect who will work personally and inspect at least once a _____.
Month
Week
3 days
Day
If work is found to be satisfactory, actual cost of labor and materials in examination plus __% shall be allowed the contractor and granted extension time on account of additional work.
25
20
15
10
Adjustment of drawings to suit field conditions may be necessary during construction. The contract recognizes the essence of this as long as resulting overruns and underruns do not exceed __%.
20
15
10
5
Upon notice of completion of work from the contractor, the architect shall immediately inspect the project. If the work is substantially complete (not less than __% is finished), the architect shall issue a certificate of completion of work in respect to the work.
90
92
95
98
Contractor shall furnish samples specified for approval. How many number of samples shall be submitted?
Five
Four
Three
Two
What does a white helmet signifies?
Architect
Engineers
Foreman
All of the Above
What does a red helmet signifies?
Emergency
Fire Fighters
Plumber
High heat Application
What does a blue helmet signifies?
Plumber
Electricians
Carpenter
Both B and C
What does a brown helmet signifies?
Plumber
Electricians
Laborer
High heat application
What does a Grey helmet signifies?
Plumber
Electricians
Site visitors
Safety Officer
What color of helmet will you wear after passing the Board Exams?
Evo
Spyder
White Helmet
All of the Above XD