NEW
Font size
WorksheetsSoftware Engineering Overview By Dr Sinthia White
Total questions: 47
Worksheet time: 24mins
The analysis phase ____________________
Determines what the program will do
Determines how the program will work
Determines whether or not the program works
Adds new features to the delivered program
The operations and maintenance phase ____________________
Determines what the program will do
Determines how the program will work
Determines whether or not the program works
Adds new features to the delivered program
The integration phase ____________________
Determines what the program will do
Determines how the program will work
Determines whether or not the program works
Adds new features to the delivered program
The implementation phase ____________________
Determines whether or not the program is feasible
Determines which classes are needed and what they will do
Determines whether or not the program works
Implements the program code
The design phase ____________________
Determines whether or not the program is feasible
Determines which classes are needed and what they will do
Determines whether or not the program works
Implements the program code
The analysis phase ____________________
Creates a diagram of the planned classes and their relationships
Creates a requirement specification
Verifies whether or not the the requirement specification has been met
Implements the program code
The integration phase ____________________
Creates a diagram of the planned classes and their relationships
Creates a requirement specification
Verifies whether or not the the requirement specification has been met
Implements the program code
SDLC means
Software Development life cycle
System development life cycle
Simple development learning cycle
Non of the above
Software engineering involves
Using engineering tools and techniques in software development
Using scientific way to software development
Both A and B
Non of the above
Risk Assessment is part of software engineering
True
False
Can't say
Non of the above
Software engineering involves quality measures to improve the quality of the software
False
True
Can't say
Non of the above
Minimizing code size is measure of quality in software
True
False
Can't say
Non of the above
Testing is the activity of software which can be avoided.
False
True
Can't say
Non of the above
Software costs more to maintain than it does to develop
True
False
Project management involves the planning, monitoring, and control of the people, process, and events that occur as software evolves from a preliminary concept to an operational implementation.
True
False
Which of the following is an activity that distributes estimated effort across the planned project duration by allocating the effort to specific software engineering tasks?
Software Macroscopic schedule
Software Project scheduling
Software Detailed schedule
None of the mentioned
Every task that is scheduled should be assigned to a specific team member is termed as
Compartmentalization
Defining milestones
Defining responsibilities
Defining outcomes
Which of the following process is concerned with analyzing the costs and benefits of proposed changes?
Change management
Version management
System building
Release management
Which granularity level of testing checks the behavior of module cooperation?
Unit Testing
Integration Testing
Acceptance Testing
Regression Testing
A set of inputs, execution preconditions and expected outcomes is known as a
Test plan
Test case
Test document
Test Suite
The testing in which code is checked
Black box testing
White box testing
Red box testing
Green box testing
WHICH ONE IS NOT ENGINEERING APPROACH
CIVIL
ELECTRICAL
MECHANICAL
SOFTWARE
DRAWING
Someone who wants to know how and why things work,Called
Cricketer
BCA students
Scientist
Designer
Someone who solves complex problems with mathematical and scientific application is Called
BCA students
Donald Trump
Engineer
Sportsmen
What is software quality?
Satisfying client needs
Proving Best Lunch
Conducting Semester Exam
Reopening university And Colleges
What do you understand by software?
New Movie
Set of sports items
Set of food items
Set of programs
Software engineering involves quality measures to improve the quality of the software
True
False
Risk Assessment is part of software engineering
True
False
Can't say
Non of the above
Who is PROJECT MANAGER?
A BCA Student
Having MCA degree
An Entrepreneur
A project manager is a person who has the overall responsibility for the successful planning and execution of a project.
RAD stands for
Relative Application Development
Rapid Application Development
Rapid Application Document
None of the mentioned
Which one of the following models is not suitable for accommodating any change?
Build & Fix Model
Prototyping Model
RAD Model
Waterfall Model
RAD Model has
2 phases
3 phases
5 phases
6 phases
What is the major drawback of using RAD Model?
Highly specialized & skilled developers/designers are required
Increases reusability of components
Encourages customer/client feedback
Increases reusability of components, Highly specialized & skilled developers/designers are required
What is the major drawback of using RAD Model?
Highly specialized & skilled developers/designers are required
Increases reusability of components
Encourages customer/client feedback
Increases reusability of components, Highly specialized & skilled developers/designers are required
What is the major advantage of using Incremental Model?
Customer can respond to each increment
Easier to test and debug
It is used when there is a need to get a product to the market early
Easier to test and debug & It is used when there is a need to get a product to the market early
The spiral model has two dimensions namely _____________ and ____________
diagonal, angular
radial, perpendicular
radial, angular
diagonal, perpendicular
If you were to create client/server applications, which model would you go for?
WINWIN Spiral Model
Spiral Model
Concurrent Model
Incremental Model
If you were to create client/server applications, which model would you go for?
WINWIN Spiral Model
Spiral Model
Concurrent Model
Incremental Model
Which two models doesn’t allow defining requirements early in the cycle?
Waterfall & RAD
Prototyping & Spiral
Prototyping & RAD
Waterfall & Spiral
Which of the following life cycle model can be chosen if the development team has less experience on similar projects?
Spiral
Waterfall
RAD
Iterative Enhancement Model
One can choose Waterfall Model if the project development schedule is tight.
True
False
Purpose of process is to deliver software
in time
with acceptable quality
that is cost efficient
both in time & with acceptable quality
The work associated with software engineering can be categorized into three generic phases,regardless of application area, project size, or complexity namely the__________ phase which focuses on what, the_________ phase which focuses on how and the_________ phase which focuses on change.
i. support
ii. development
iii. definition
1, 2, 3
2, 1, 3
3, 2, 1
3, 1, 2
Which of the following activities of a Generic Process framework provides a feedback report?
Communication
Planning
Modeling & Construction
Deployment
Four types of change are encountered during the support phase. Which one of the following is not one that falls into such category?
Translation
Correction
Adaptation
Prevention
Agile Software Development is based on
Incremental Development
Iterative Development
Linear Development
Both Incremental and Iterative Development
How many phases are there in Scrum ?
2
3
4
5
