wayground logo

Free Printable Worksheets

NEW

Font size

S
M
L
XL
Worksheets

Exam 105

Total questions: 30

Worksheet time: 15mins

Name
Class
Date
1.

tools that use power delivered by man only

a)

Hand Tools

b)

Power Tools

c)

Equipment

d)

Heavy Equipment

2.

that employ power supplied by forces other than that coming from humans

a)

Hand Tools

b)

Power Tools

c)

Equipment

d)

Heavy Equipment

3.

refers to large,

complex tools and machines that is designed to

do a particular job

a)

Hand Tools

b)

Power Tools

c)

Equipment

d)

Heavy Equipment

4.

equipment which is very

large and very powerful

a)

Hand Tools

b)

Power Tools

c)

Equipment

d)

Heavy Equipment

5.

made by mixing portland cement, sand,

and water

a)

Cement mortar

b)

Lime mortar

c)

Cement-lime mortar

d)

Masonry cement

6.

a mixture of lime, sand, and water that is

rarely used because of its slow rate of hardening and low

compressive strength

a)

Cement mortar

b)

Lime mortar

c)

Cement-lime mortar

d)

Masonry cement

7.

a cement mortar to which lime is

added to increase its plasticity and water retentivity

a)

Cement mortar

b)

Lime mortar

c)

Cement-lime mortar

d)

Masonry cement

8.

a proprietary mix of Portland cement

and other ingredients, as hydrated lime, plasticizers, air

entraining agents, and gypsum, requiring only the addition

of sand and water to make cement mortar

a)

Cement mortar

b)

Lime mortar

c)

Cement-lime mortar

d)

Masonry cement

9.
a)

Bull Nose

b)

Jamb

c)

Corner

d)

Double Corner or Pier

10.
a)

Bull Nose

b)

Jamb

c)

Corner

d)

Double Corner or Pier

11.
a)

Bull Nose

b)

Jamb

c)

Corner

d)

Double Corner or Pier

12.

fig 1:

wood sticks or boards nailed horizontally at the stake which serve as the horizontal plane where the reference point of the building measurements are established

a)

Batter Boards

b)

Leveling

c)

Stakes

d)

Strings

13.

fig 2:

wooden sticks used as posts sharpened at one end driven into the

ground to serve as boundaries or supports of the batter boards

 

a)

Batter Boards

b)

Leveling

c)

Stakes

d)

Strings

14.
a)

Shoulder Miter

b)

Tounged Miter

c)

Coped Joint

d)

Miter Joint

15.
a)

Shoulder Miter

b)

Tounged Miter

c)

Coped Joint

d)

Miter Joint

16.

0% ventilating; consists

of a frame and stationary sash

a)

Fixed Window

b)

Casement Window

c)

Awning and Hopper Window

d)

Sliding Windows

e)

Double-Hung Window

17.

100% ventilating;

has operating sashes that are hinged,

swinging outward

a)

Fixed Window

b)

Casement Window

c)

Awning and Hopper Window

d)

Sliding Windows

e)

Double-Hung Window

18.

100%

ventilating; has operating sashes that

swing outward on hinges attached to the

top of the frame

a)

Fixed Window

b)

Casement Window

c)

Awning and Hopper Window

d)

Sliding Windows

e)

Double-Hung Window

19.

50% ventilating; Has 2

or more sashes, of which at least 1 slides

along a track

a)

Fixed Window

b)

Casement Window

c)

Awning and Hopper Window

d)

Sliding Windows

e)

Double-Hung Window

20.

50% ventilating;

has 2 vertically sliding sashes, each in

separate tracks, closing different parts of

the window

a)

Fixed Window

b)

Casement Window

c)

Awning and Hopper Window

d)

Sliding Windows

e)

Double-Hung Window

21.

Shoring is a process of transferring a portion of the

load of the wall to temporary footings and done when the

excavation does not go much below the adjoining footings

and when the material is fairly solid.

a)

TRUE

b)

FALSE

22.

Leveling and Grading is the process of digging

the earth to provide a place for the foundation of the building.

a)

TRUE

b)

FALSE

23.

receptacles for the runoff of surface water. They have a basin

or sump that retains heavy sediment before it can pass into an underground drainpipe

a)

Catch Basins

b)

Culverts

c)

Foundation drainage tile or pipe

d)

Drainage tile

24.

are drains or channels passing under a road or walkway

a)

Catch Basins

b)

Culverts

c)

Foundation drainage tile or pipe

d)

Drainage tile

25.

Tile or piping for the collection of sub surface water, dispersion of septic

tank effluent, and the like

a)

Catch Basins

b)

Culverts

c)

Foundation drainage tile or pipe

d)

Drainage tile

26.

 a hollow tile, usually laid end to end as piping (with open joints) in soil in

order to drain water saturated soil, or used to permit fluid in the hollow-tile

pipe to disperse into the ground (as in an absorption field)

a)

Catch Basins

b)

Culverts

c)

Foundation drainage tile or pipe

d)

Drainage tile

27.

consists of an underground network of piping for conveying groundwater

to a point of disposal, as a storm sewer system or a natural outfall at a

lower elevation on the site. Excess groundwater can reduce the load

carrying capacity of a foundation soil and increase the hydrostatic

pressure on a building foundation. Waterproofing is required for basement

structures situated close to or below the water table of a site.

a)

Sub-Surface Drainage

b)

Surface Drainage

c)

Site Drainage

d)

NOTA

28.

refers to the grading and surfacing of a site in order to divert rain and

other surface water into natural drainage patterns or a municipal

storm sewer system. Grass and lawn areas are sloped 1.5% to 10%;

while paved parking areas, 2% to 3%. A holding pond may be

necessary when the amount of surface runoff exceeds the capacity

of the storm sewer system

a)

Sub-Surface Drainage

b)

Surface Drainage

c)

Site Drainage

d)

NOTA

29.

shallow depressions formed by the intersection of two ground slopes,

designed to direct or divert the runoff of surface water. Grass swales slope

1.5% to 2%; while paved swales, 4% to 6%

a)

Absorption Trench

b)

Swales

c)

Area Drain

d)

Dry Wells

30.

receptacle designed to collect surface water or rainwater from an open area

a)

Absorption Trench

b)

Swales

c)

Area Drain

d)

Dry Wells