2022 06 LEED Green Associate Energy and Atmosphere

Total questions: 84

Worksheet time: 1hrs 3mins

Name
Class
Date
1.

What is lighting power density measured in?

a)

Number of luminaries per unit area

b)

Installed lighting power per unit area

c)

Footcandles per floor area

d)

The quantity of light trespass on adjacent sites, measured in watts

2.

Which of the following is a measure of energy use intensity?

a)

Energy consumed per unit of floor space

b)

The amount of electricity a photovoltaic system can produce

c)

The efficiency of an HVAC system

d)

Daylighting

3.

When calculating building energy performance, what is included as process energy? 

a)

Elevator

b)

High efficient HVAC unit

c)

Instant hot water heater

d)

Walkway lighting

4.

Which of the following building components contribute to the plug load?

a)

Recessed lighting

b)

Elevators

c)

Computers

d)

HVAC system

5.

One way to reduce a building's energy load is to do which of the following?

a)

Increase the size of the building

b)

Site the building far away from adjacent buildings

c)

Reduce a building's thermal mass

d)

Configure the building to minimize solar gain in summer and maximize it in winter

6.

Using passive strategies such as daylighting is an example of which of the following:

a)

Reducing energy demand

b)

Increasing energy efficiency

c)

Renewable energy practice

d)

Energy performance management

7.

Increasing the thermal mass of a building and installing a photovoltaic system would help with:

a)

Reducing energy demand and increasing energy efficiency

b)

Reducing energy demand and increasing renewable energy

c)

Increasing energy efficiency and increasing renewable energy

d)

Decreasing energy efficiency and increasing renewable energy

8.

In commercial buildings, on average which end use consumes the most energy?

a)

Space heating

b)

Lighting

c)

Cooling

d)

Ventilation

9.

A project team is reviewing strategies to increase energy efficiency. Which of the following will help reduce plug-load demands?

a)

Computer modeling

b)

Efficient street lighting

c)

High-performance glazing

d)

Installing appliances that meet or exceed ENERGY STAR requirements

10.

Why is it important to categorize spaces in LEED?

a)

It helps with floor area calculations

b)

Smaller spaces have lower baseline requirements

c)

Depending on the space categorization, the credit requirements may not apply

d)

The types of spaces are used to determine building density

11.

Regularly occupied spaces would include which of the following:

a)

Dorm room

b)

Break room

c)

Corridor

d)

Restroom

12.

What is an example of a space that is typically unoccupied? 

a)

Airplane hanger

b)

Data center floor area

c)

Gymnasium

d)

Private office

13.

Which of the following is a type of individual occupant space?

a)

Hospital exam room

b)

Auto service bay

c)

Study carrel

d)

Hotel front desk

14.

A developer wants to reduce energy demand to lower the heating and cooling costs of a new building project. What strategy would help with this goal?

a)

Purchase Renewable Energy Credits (RECs)

b)

Increase the size of the building

c)

Adding more windows to the building envelope

d)

Optimize the building orientation

15.

A building owner wants to increase efficiency to lower the operating costs of a new building project. What strategy would help with this goal?

a)

Install all LED lighting

b)

Provide daylighting

c)

Install triple-paned glass windows instead of double-paned glass windows

d)

Install a photovoltaic system on the roof

16.

Energy efficiency is defined as:

a)

The replacement of any older building product with a newer building product

b)

Any strategy that reduces resource use 20% from a baseline comparison

c)

Any strategy that reduces resource use 10% or more from a baseline comparison

d)

The use of technology that requires less energy to perform the same function as a conventional item

17.

A school building consumes electricity from the grid at night while contributing energy back to the grid during the day from on-site solar panels, resulting in the school having no electricity costs. This is an example of:

a)

Carbon neutrality

b)

Net-zero energy

c)

Water balance

d)

Zero waste

18.

What process uses heat recovery to capture heat from the process of generating electricity and then turns the recovered heat into thermal energy that can be used to heat a building?

a)

Evapotranspiration

b)

Commissioning

c)

Cogeneration

d)

Tertiary treatment

19.

What is an environmental benefits of cogeneration? 

a)

Reduced erosion and sedimentation

b)

Reduced air pollution

c)

Reduced wastewater generation

d)

Recharging of aquifers

20.

Which of the following is the median payback period for the commissioning of new buildings?

a)

1.5 years

b)

2.6 years

c)

3.9 years

d)

4.8 years

21.

What is the median payback period for the commissioning of existing buildings?

a)

0.7 years

b)

1 year

c)

1.5 years

d)

2.8 years

22.

Which of the following must occur to ensure energy-efficient design is carried through to efficient performance?

a)

Staff training

b)

Sixty day post occupancy review after the building is certified

c)

Yearly maintenance of all non-energy related systems

d)

Indoor air-quality monitoring

23.

Commissioning of a building is intended to verify the building and its systems meet which of the following:

a)

Local building code

b)

The owner's project requirements

c)

HVAC specifications

d)

Occupant preferences

24.

Which of the following project team members is responsible for verifying and documenting that a building and all of its systems and assemblies are planned, designed, installed, tested, operated, and maintained to meet the owner's project requirements?

a)

The mechanical engineer

b)

The project administrator

c)

The commissioning authority

d)

The LEED project reviewer

25.

During a LEED project when does commissioning take place?

a)

Discovery phase

b)

Pre-design phase

c)

Schematic design phase

d)

Substantial completion phase

26.

Which of the following is a benefit of commissioning?

a)

Fewer system deficiencies

b)

Reduced construction schedules

c)

Decreased project costs

d)

Reduced operational training

27.

A developer is building a medical park that will have ten buildings for doctors' offices. Which of the following is a strategy for achieving energy efficiency?

a)

Installing a community solar garden

b)

Building a district heating and cooling system

c)

Siting the buildings close to each other

d)

Purchasing carbon offsets

28.

Which of the following project areas would retrocommissioning aid?

a)

Operational energy efficiency

b)

Identifying system problems prior to occupancy

c)

Selecting environmentally preferable products

d)

Advanced energy metering

29.

A building owner of a new extended-stay hotel is concerned about the higher initial costs for ENERGY STAR appliances. Which of the following could help with the decision-making process?

a)

Showing the GHG emissions that would be reduced

b)

Reviewing the building's energy use for ways to improve efficiency

c)

Using computer modeling to prioritize the owner's project requirements

d)

A life cycle costing of the trade-offs between the capital and operating costs

30.

The owner of a historic renovation project wants to achieve carbon neutrality. Which of the following design decision will help the project team achieve this?

a)

Purchasing Renewable Energy Credits (RECs)

b)

Using no more water than what falls on the site as precipitation

c)

Purchasing carbon offsets

d)

Participating in a demand response program

31.

A data center in a rural area wants to be net-zero. Which of the following design decisions will help the project team achieve this?

a)

Install a photovoltaic system on site

b)

Purchase carbon offsets

c)

Purchase Renewable Energy Credits (RECs)

d)

Provide all occupants with electric vehicles

32.

A home owner in a sunny climate has decided to lease a photovoltaic system instead of purchase one. Which of the following about that choice is true?

a)

Leasing the system would allow the owner to participate in a demand response program.

b)

Leasing the system would offset a large up-front cost.

c)

Leasing the system would decrease the home's electricity demand.

d)

Leasing the system would increase the home's energy efficiency.

33.

Which of the following is a benefit of a building owner choosing to install a wind turbine on site to reduce the building's use of grid-source nonrenewable energy?

a)

Reduced greenhouse gas emissions

b)

Lower liabilities

c)

Decreased up-front building costs

d)

Heat island reduction

34.

What helps utilities optimize their supply-side energy generation and delivery systems?

a)

Daylighting automation systems

b)

Building owners that purchase carbon offsets

c)

Customers that enroll in a demand response program

d)

Building submetering

35.

A demand response (DR) event is triggered by the ____.

a)

Facility manager

b)

Building owner

c)

Utility company

d)

Building occupants

36.

If a building owner enrolls in a demand response program, which of the following will happen?

a)

The owner will have to purchase carbon dioxide equivalents equal to the annual grid-generated electricity.

b)

The owner will have to purchase RECs equal to fifty percent of the building's yearly electricity use.

c)

During off-peak times, the building's excess electricity may be sold back to the utility company.

d)

The building may have to decrease electricity use during peak times.

37.

A refrigerated warehouse project in the design phase could reduce its electricity demand by taking which of the following actions?

a)

Purchasing carbon offsets to counter GHG emissions

b)

Enrolling in a demand response program

c)

Purchasing Renewable Energy Credits (RECs)

d)

Purchasing all electricity from a wind farm

38.

An owner wants to install a photovoltaic system on the building's rooftop and sell the excess electricity back to the utility company. Which of the following would be aided by this strategy?

a)

Demand response

b)

On-site renewable energy

c)

Green power

d)

Carbon offsets

39.

A project is located in an area with a demand-response program and on a site that has enough room for a wind-turbine to allow for on-site renewable energy. If the project implements both of these strategies, which of the following will occur?

a)

The project's energy costs will decrease

b)

The project's renewable energy production will decrease

c)

The project's minimum energy performance will decrease

d)

The project's energy demands will decrease

40.

What is the most common way to meet the requirements of off-site renewable energy?

a)

Purchasing Renewable Energy Credits (RECs)

b)

Directly purchasing green power from local utility companies

c)

Installing a rooftop photovoltaic array

d)

Obtaining energy from a geothermal system

41.

Which of the following is NOT an example of on-site generated renewable energy?

a)

Solar

b)

Wind

c)

Biofuel-based electrical system

d)

Renewable Energy Credits (RECs)

42.

Which of the following is a difference between Renewable Energy Credits (RECs) and a carbon offset?

a)

RECs are purchased

b)

RECs encourage the reduction of GHG emissions

c)

RECs are tradable commodities

d)

RECs must be purchased locally

43.

Which of the following is reduced with the help of carbon offsets?

a)

Greenhouse gas emissions

b)

CFCs

c)

Ozone

d)

Water contamination

44.

What does a carbon offset represent?

a)

A tradable commodity representing proof that a unit of electricity was generated from a renewable resource

b)

A unit of carbon dioxide equivalent that is reduced, avoided, or sequestered to compensate for emissions occurring elsewhere.

c)

The energy consumption divided by the number of square feet in a building

d)

The primary measure of energy consumption associated with buildings

45.

A project owner wants to provide financial support to a reforestation project. What would help with this goal?

a)

On-site renewable energy

b)

Green power

c)

Building in a high-priority site

d)

Carbon offsets

46.

To qualify for LEED, carbon offsets must be which of the following?

a)

Green-e Energy certified (or equivalent)

b)

Green-e Climate certified (or equivalent)

c)

ENERGY STAR labeled

d)

Purchased and used within the same state or locale.

47.

What benefit does purchasing off-site renewable energy (Green Power) have?

a)

The building will avoid electricity blackouts

b)

The building design will be more efficient

c)

Off-site renewable energy costs less than off-site non-renewable energy

d)

Less emissions will be generated

48.

What does a REC represent?

a)

The quantity of fossil fuels avoided by purchasing renewable energy, expressed in tons

b)

The amount of energy purchased from a Green-e supplier

c)

The environmental, social, and other positive attributes of power generated by renewable resources

d)

The amount of energy an electricity provider purchases from renewable sources

49.

A building automation system will assist with collecting data about which of the following:

a)

Energy spikes that occur every morning

b)

Complaints from occupants about a loud fan noise in a conference room

c)

Cleanliness of restrooms

d)

Maintenance schedule for replacing air filters

50.

A developer is considering pursuing LEED for an eight-story, multi-family residential project. How would the baseline building performance be determined?

a)

By calculations made using ASHRAE 90.1

b)

By the project obtaining a HERS index

c)

By obtaining an ENERGY STAR for Homes rating

d)

By using the EPA's ENERGY STAR Portfolio Manager

51.

An owner for a new three-story office space wants to know how the building compares to other buildings of similar function. Which of the following can be used to compare the performance of the building?

a)

Local tax records

b)

LEED Online

c)

EPA's ENERGY STAR Portfolio Manager

d)

Commissioning reports

52.

Once occupants are in a building, how can the project team maintain ongoing energy efficiency?

a)

Fundamental Commissioning

b)

By monitoring building automation systems

c)

Recharging refrigerants more often than manufacturers recommendations

d)

By purchasing Renewable Energy Credits (RECs)

53.

Which of the following actions should a project team take to make sure a building remains efficient during its operation?

a)

Verify that no issues occur during a demand-response event

b)

Turn on all systems to their maximum output to confirm the building can handle the load

c)

Ensure that the building systems are functioning as designed and that they support the owner's project requirements

d)

Run computer simulations to prioritize energy-efficiency opportunities

54.

Which of the following would require use of the EPA's ENERGY STAR Portfolio Manager?

a)

Calculating a building's minimum energy use

b)

Bulk uploading project information into LEED online

c)

Registering a large volume of LEED projects

d)

Comparing the ongoing operating performance of a building with its intended design performance

55.

What LEED credits reward projects for improving operational energy performance?

a)

Integrative process

b)

Energy metering

c)

Green power and carbon offsets

d)

Demand response

56.

After a building is completed and occupied, how can energy demand be reduced?

a)

By opening and closing shades to control solar energy

b)

By purchasing environmentally preferable cleaning supplies

c)

By conducting routine waste audits

d)

By encouraging occupants to stagger work hours

57.

Which of the following causes depletion of the ozone layer?

a)

Ammonia

b)

CFCs

c)

Propane

d)

CO2

58.

On a project with an older existing HVAC&R system that uses CFCs, what can the project team do to earn LEED certification?

a)

Recharge the equipment with CFCs

b)

Make a phase out plan for the removal of the CFC based refrigerants

c)

Get a state exemption for the HVAC&R system

d)

Eliminate all refrigerant leaks

59.

What minimum contract length is required for an owner to purchase renewable energy certificates (RECs) for LEED credit?

a)

1 year

b)

3 year

c)

5 year

d)

10 year

60.

What environmental issue is associated with refrigerants used in HVAC&R systems?

a)

Groundwater contamination

b)

Soil contamination

c)

Increased CO2 indoors

d)

Increasing greenhouse gas emissions

61.

Which of the following refrigerant is banned under the Montreal Protocol?

a)

CFCs

b)

Propane

c)

Isopentane

d)

HFCs

62.

Developing nations banned ChloroFluoroCarbons (CFCs) under the:

a)

Kyoto Treaty

b)

Montreal Protocol

c)

EPA Clean Air Act

d)

Executive Order 95-231

63.

What year does the Montreal Protocol phase out HCFCs?

a)

1995

b)

2015

c)

2020

d)

2030

64.

What statement is true regarding HydroFluoroCarbons (HFCs)?

a)

HFCs are scheduled to be banned under the Montreal Protocol

b)

The HFC refrigerant group includes NH3, CO2, and propane

c)

HFCs have high ozone depletion potential

d)

Many HFCs have a significant global warming potential

65.

What statement is true regarding ChloroFluoroCarbons (CFCs) and HydroChloroFluoroCarbons (HCFCs)?

a)

CFCs are being phased-out under the Montreal Protocol while HCFCs are banned under the Montreal Protocol

b)

CFCs have a greater global warming potential (GWP) than HCFCs

c)

The ozone depletion potential (ODP) of HCFCs and CFCs is about the same

d)

LEED encourages replacing CFC or halon-based fire suppression systems with HCFCs

66.

What variable measure a refrigerant's impact on the environment?

a)

Greenhouse gas lifetime

b)

Lifecycle potential

c)

Global warming potential

d)

Global warming period

67.

What has a long atmospheric life that causes harm to the ozone layer?

a)

CFCs

b)

NH3

c)

HCs

d)

HCFCs

68.

Which of the following has the greatest direct impact on global warming?

a)

HVAC operating efficiency

b)

Building orientation

c)

SRI of a building's roof

d)

Size of a project's impermeable areas

69.

What is GWP as it relates to refrigerants?

a)

The speed at which an appliance loses its refrigerant

b)

The potential for a single molecule of the refrigerant to destroy the ozone layer

c)

The efficiency of a refrigerant

d)

A measurement of how much effect the given refrigerant will have on global warming in relation to carbon dioxide.

70.

Which project would NOT be eligible for LEED certification?

a)

A new building project that uses no refrigerants

b)

A new building project that uses hydrocarbons (HCs) as refrigerants

c)

A new building project that uses CFC-based refrigerants

d)

An existing building project that phases out the use of CFC-based refrigerants no later than 5 years after the project is completed

71.

What has ozone depletion potential (ODP)?

a)

Paints with high VOCs

b)

CFC-based refrigerants used in HVAC systems

c)

Construction dust

d)

Runoff from the flooding of a construction site

72.

What statement is true regarding HydroChloroFluoroCarbons (HCFCs)?

a)

HCFCs are refrigerants currently banned by the Montreal Protocol

b)

HCFCs have a low ozone depletion potential compared to CFCs

c)

HCFCs are a type of natural refrigerant

d)

LEED requires zero use of HCFCs

73.

Approximately 50% of chillers in existing buildings use what refrigerant?

a)

CFC-11

b)

HCFC-22

c)

HFC-23

d)

NH3

74.

With regards to refrigerants what is a natural conflict between the prevention of ozone depletion and global warming?

a)

Refrigerants that deplete the ozone layer are less efficient

b)

Refrigerants that are neutral to the ozone layer are less efficient

c)

Refrigerants contain ozone layer gases

d)

Refrigerants contain global warming gases

75.

Which refrigerant is considered environmentally benign? 

a)

Halons

b)

HydroFluoroCarbons

c)

Chlorofluorocarbon

d)

Hydrocarbons

76.

An existing office building has a 20-year old chiller that uses CFC-11. An owner is considering a major renovation of the building and applying for LEED for New Construction certification. What statement is true about the project's ability to earn LEED certification?

a)

The owner must replace the chiller to earn LEED certification

b)

The owner can implement a phase-out plan to earn LEED certification

c)

The owner can leave the existing system in place as-is

d)

The owner will not be able to achieve a Platinum level certification

The project could still achieve any level of certification.

77.

What project areas would you find refrigerants like CFCs?

a)

Hot water heating and Window a/c units

b)

Radiant flooring and Water Coolers

c)

Centrifugal Chillers and Window a/c units

d)

Single Split HVAC systems and Centrifugal Chillers

78.

Which of the following is not an alternative LEED recommends for reducing stratospheric ozone depletion?

a)

Designing a building to use natural ventilation

b)

Selecting refrigerants with lower Ozone Depltion Potential (ODP) and Global Warming Potential (GWP)

c)

Selecting refrigerants that have a long atmospheric lifetimes

d)

Using natural refrigerants

79.

What environmental issue is associated with refrigerants used in HVAC&R systems?

A. Damage to the Earth's ozone layer

a)

Damage to the Earth's ozone layer

b)

Increased air pollution

c)

Increased use of fossil fuels

d)

Pollution of water bodies

80.

What type of energy source generates the least air and water pollution?

a)

Wind

b)

Clean coal

c)

Natural gas

81.

What environmental issue is associated with the burning of fossil fuels?

a)

Release of carbon dioxide

b)

Reduction of water from aquifers

c)

Interference with migratory birds

d)

Sedimentation of water supplies

82.

An owner wants to offset the environmental impact of a building's energy use. What is a benefit of purchasing off-site renewable energy or renewable energy certificates (RECs) over installing onsite renewable energy systems such as photovoltaic panels?

a)

The upfront costs to the building owner would be lower

b)

Off-site renewable energy and RECs are less expensive than grid-source non-renewable energy

c)

RECs only have to be purchased one-time to offset the building's lifetime energy use

d)

RECs can be shared across multiple LEED projects

83.

Reduced emissions are a benefit of purchasing:

a)

Certified wood

b)

Renewable Energy Credits (RECs)

c)

Materials with high SRI

d)

Materials with high SRI

84.

A project owner that chooses to use onsite renewable energy sources instead of oil, coal, and natural gas gets what economic benefit of the triple bottom line?

a)

Decreasing destructive extraction processes

b)

Protection from uncertain supplies

c)

Avoiding escalating market prices

d)

Contributing to national security vulnerability