1.

Materials and devices _____ shall be listed, with specific exceptions noted in the standard.

a)

essential to successful system operation

b)

in the entire sprinkler system

c)

approved by the AHJ

d)

located in the piping network

2.

Valve trim and gaskets______.

a)

are required to be listed

b)

may be required to be listed

c)

shall not be required to be listed

d)

are required to be approved and listed

3.

Nonmetallic pipe and fittings ______.

a)

are only required to be approved

b)

are exempt from listing

c)

shall be listed

d)

may be required to be listed

4.

Drain valves and drain piping _____.

a)

are not required to be listed

b)

shall be listed

c)

shall be approved and listed

d)

shall be listed for draining sprinkler systems

5.

If a sprinkler has been removed from a fitting or an outlet ______.

a)

it can be reinstalled after inspection for damage

b)

it can be reinstalled if removed for remodeling of system

c)

it can be reinstalled if installed less than 5 years ago

d)

it shall not be reinstalled

6.

The maximum ceiling temperature for an intermediate temperature classification sprinkler is ___ degrees.

a)

100

b)

150

c)

225

d)

300

7.

The glass bulb color of a high temperature classification sprinkler is _____.

a)

orange

b)

blue

c)

green

d)

black

8.

Sprinklers shall be painted _____.

a)

by a licensed painting contractor using any approved paint

b)

in the field using listed fire sprinkler coatings

c)

by the sprinkler manufacturer

d)

in the field if the operation elements have been protected from overspray

9.

For a sprinkler installation in a building with 400 sprinklers, no fewer than ____ sprinklers are required for stock of spare sprinklers

a)

6

b)

12

c)

24

d)

36

10.

For standard steel pipe, with pressures up to 300 PSI, the minumum wall thickness for 8 inch pipe having cut grooves is schedule ___.

a)

10

b)

20

c)

30

d)

40

11.

The minimum wall thickness for 6 inch steel pipe joined by roll grooving is ___.

a)

schedule 10

b)

0.134 in.

c)

0.188 in.

d)

schedule 40

12.

For bending of schedule 40 pipe for sizes 2 in. and smaller, the minimum bend radius is ____ pipe diameters.

a)

2

b)

4

c)

6

d)

10

13.

Joint compound or tape shall be applied _____.

a)

only to female threads

b)

to both male and female threads

c)

only to male threads

d)

to male threads, female threads, then male threads again

14.

Torch cutting and welding _____ as a means of modifying or repairing sprinkler systems.

a)

shall not be permitted

b)

is only allowed if permitted by the AHJ

c)

shall be permitted

d)

is sometimes permitted

15.

Solder joints shall be permitted for exposed wet pipe systems in light hazard occupancies where the temperature classification of the installed sprinklers is of the _____ temperature classification.

a)

ordinary

b)

ordinary or intermediate

c)

intermediate or high

d)

high or extra high

16.

Listed indicating control valves shall not close in less than ___ seconds when operated at maximum possible speed from the fully open position.

a)

5

b)

15

c)

30

d)

45

17.

Drain valves and test valves _____.

a)

shall not be required to be listed

b)

shall be approved

c)

shall be listed