Wayground logo

Free Printable Worksheets

Font size

S
M
L
XL
Worksheets

PTP Preparation & DEHSR

Total questions: 20

Worksheet time: 15mins

Name
Class
Date
1.

What is the full form of PTP ?

a)

Pro Task Planning

b)

Pre Task Plan

c)

Par Task Planning

d)

Par Task Plan

2.

Who has to Approve the DEHSR ?

a)

Site Engineer

b)

Section Incharge

c)

EHSO

d)

Planning Incharge

3.

This symbol represents ?

a)

Old Pole

b)

New Pole

c)

Existing Pole

d)

Broken Pole

4.

This Symbol Indicates ?

a)

Safe Limit

b)

Safe Area

c)

Better Area

d)

Battery Limit

5.

What are the things that PTP identifies?

a)

The Day work Activities

b)

Hazard associated with work activity

c)

Steps employees take to avoid the work activity

d)

All of these

6.

Final Non-LC PTP to be prepared:

a)

Before 24 hours

b)

Before 12 hours

c)

Before work execution at the site

d)

Anytime

7.

Before Final PTP preparation what is necessary and needed to be done:

a)

Visiting the site location

b)

Rough PTP for inputs

c)

Identification of physical hazards

d)

All of these

8.

Identify the reference symbol:

a)

New Rail Pole

b)

Earthing / Discharge rod location

c)

New DTR

d)

New PSSC Pole

9.

A PTP Sketch must contain:

a)

Landmark

b)

Nearby existing electric line

c)

Battery Limit Area

d)

All of these

10.

PTP must be prepared by:

a)

Site Engineer

b)

Site Supervisor

c)

Site Incharge

d)

None of the above

11.

PTP must be created from which direction:

a)

East

b)

South

c)

North

d)

West

12.

All DTR & damaged poles must be mentioned in PTP in which color:

a)

Blue

b)

Orange

c)

Red

d)

Yellow

13.

Mobilizing of PPEs to the site is the responsibility of?

a)

EHSO

b)

Site Engineer

c)

Sub-contractor

d)

Section Incharge

14.

Battery limit should be mentioned in which color ink?

a)

Yellow

b)

Green

c)

Blue

d)

Black

15.

Approved PTP hard copy must be available at site.

a)

True

b)

False

16.

Identify the reference symbol:

a)

Transformer location

b)

Existing DTR

c)

Landmark

d)

Danger tag point

17.

Non LC Plan must be approved from Section Incharge / EHSO

a)

Before 8 PM on previous day

b)

Before 24 hours

c)

After 8 PM on previous day

d)

Anytime before execution

18.

Description of Site specific hazards, Battery Limit are discussed exclusively in ?

a)

PEP Talk

b)

Training

c)

Casually told to workmen

d)

none

19.

Subcontractor can take LC directly from Client

a)

True

b)

False

20.

 If any incident happens outside the battery limit area, who is solely responsible for it ?

a)

Site Engineer

b)

Project Manager

c)

Sub-contractor

d)

Section Incharge