1.

Under PD 1096, which of the following standards/requirements must be complied with in order to obtain a building permit?

a)

Structural Design

b)

Line and Grade

c)

Zoning/Land Use

d)

All listed items

2.

In the Architect’s Code of Ethics, to whom does the Architect have responsibility to consider needs and aesthetic and functional requirements?

a)

Public

b)

Client

c)

Manufacturer's/Dealers

d)

Contractor

3.

What type of specifications is one where any manufacturer whose product meets the specified performance and description may bid?

a)

Closed

b)

Descriptive

c)

Open

d)

Brand name

4.

What project management tool used by architects which consists of identifying the most critical set of activities and computing critical path schedules for implementation?

a)

Critical Path Method

b)

Project Breakdown Structure Method

c)

Network Analysis

d)

Gantt Chart

5.

Under the architect’s design-build services on a guaranteed maximum cost, which of the following conditions should be observed?

a)

Savings on project cost go to client only

b)

Savings on project cost go to architect only

c)

20 percent of project cost as architect’s fee

d)

None of listed items

6.

Which of the following describes the percentage of cost method of compensation for architect’s services?

a)

Establishes a fixed sum/reimbursement for architect’s technical time/overhead

b)

Flexible; does not affect owner-architect agreement in case of changes

c)

Adds technical services costs/uses as multiplier for overhead/profit

d)

Applies only to non-creative work pre-design services

7.

 In the architect’s range of services, which of the following comprise/s specialized allied services?

a)

Physical planning

b)

Acoustics

c)

Landscape design

d)

All listed items

8.

Under BP 220, what is the minimum fire-resistance rating for a firewall?

a)

Four hours

b)

Three hours

c)

Two hours

d)

One hour

9.

Under Article 1723 of the Civil Code, which of the following is true?

a)

Action against erring architect/engineer must be brought within 15 years following the collapse of the building.

b)

The contractor is liable for damages caused by defective plans/specifications.

c)

Acceptance of building implies waiver of any cause of any action due to defects in building.

d)

None of the listed items.

10.

Which of the following is the most disadvantageous to both architect and client as a method of compensation?

a)

Per diem plus reimbursable expenses

b)

Percentage of construction cost

c)

Lump sum or fixed fee

d)

All listed items

11.

In the construction documents stage of the architect’s design services, which of the following are prepared?

1. general conditions

2. bill of materials

3. cost estimates

4. socio-economic studies

5. all listed items

a)

1, 2, 3

b)

2, 3, 4

c)

1, 3, 4

d)

5

12.

What legal mandate provides for installation/incorporation in buildings, as well as streets and highways, such as architectural/structural features in order to enhance mobility of disabled persons?

a)

BP 433

b)

PD 229

c)

PD 344

d)

BP 344

13.

In the architect’s range of services, under which services does building/equipment maintenance fall?

a)

Post construction

b)

Specialized allied

c)

Design-build

d)

Comprehensive

14.

What is the maximum width (meters) of space allowed by the Building Official to encroach a public sidewalk, street or alley to be used during construction?

a)

1.20

b)

1.50

c)

2.00

d)

1.00

15.

What aspect of architect’s professional services do interior design belong?

a)

Physical planning

b)

Regular design services

c)

Specialized allied services

d)

Comprehensive planning

16.

In the architect’s specialized services, under which services does the architect conduct bids/negotiations with furniture fabricators/suppliers?

a)

Landscape design

b)

Interior design

c)

Environmental planning

d)

Physical planning

17.

Which of the following is not performed by the architect under the design-build services by administration?

a)

Keeps records and books of accounts

b)

Appoints construction superintendent, purchasing agent, timekeeper, property clerks, etc.

c)

Prepares the schedule of work, construction program, construction estimates, bill of materials, etc.

d)

Advances funding for payment of expenditures connected with the work

18.

Under PD 1096, which of the following is a reason for non-issuance of a building permit?

a)

Lot registered in applicant’s name

b)

Errors found in plans and specifications

c)

Incomplete detailed bill of materials

d)

No construction work program/Gantt chart

19.

What advantage does the design-build service of the architect have in terms of construction budget?

a)

Fixed construction budget

b)

Corrections done immediately

c)

Fixed construction period

d)

Convenience

20.

Which of the following factors determine the multiplier in the multiple direct personnel expenses?

a)

Architect’s experience

b)

Office set-up

c)

Complexity of project

d)

All listed items

21.

Under PD 1096, when adequate railings for protection are required, what should be their minimum height (meters)?

a)

1.20

b)

1.00

c)

0.90

d)

0.80

22.

In the architect’s range of services, which of the following comprise/s pre-design services?

a)

Construction scheduling

b)

Perspective layout

c)

Schematic design

d)

Economic feasibility studies

23.

What type of specifications specifies the manufacturer’s name/brand name?

a)

Performance

b)

Descriptive

c)

Closed

d)

Brand name

24.

What legal mandate created the Fire Code of the Philippines?

a)

PD 1285

b)

PD 1187

c)

PD 1282

d)

PD 1185

25.

In the architect’s post-construction services, under which services does the architect evaluate the plan’s functional and construction design effectiveness?

a)

Building/equipment maintenance

b)

Building/grounds administration

c)

Comprehensive services

d)

Post-construction evaluation

26.

Under the Fire Code, what is the maximum width (meters) of a single door in a doorway?

a)

0.82

b)

1.52

c)

1.42

d)

1.22

27.

With regards to responsibilities to his client, which of the following is/are expected of the architect?

a)

Presents examples of professional experience

b)

Explains conditions of project cost estimates

c)

Ascertains exact nature/scope of services/professional fees

d)

All listed items

28.

In the architect’s range of services, under which services does landscape design fall?

a)

Construction

b)

Design

c)

Pre-design

d)

Specialized allied

29.

Which of the following does NOT constitute the post-construction services of the architect?

a)

Post-construction evaluation

b)

Building/equipment maintenance

c)

Real property evaluation

d)

Building/ground administration

30.

Which of the following services is not included in the architect’s fee for professional services?

a)

Structural services

b)

Electrical services

c)

Sanitary/mechanical engineering services

d)

Surveys/soil exploration

31.

In PD 1096, which of the following conditions indicate dangerous buildings/structures?

1. inadequate sanitation/health facilities

2. improper occupancy

3. improper location

4. illegal construction

5. all listed items/conditions

a)

1, 3, 4

b)

2, 3, 4

c)

1, 2, 3

d)

5

32.

What is referred to as an outline specification enumerating the type or trade names of materials to be used?

a)

Bid bulletin

b)

General conditions

c)

Schedule of materials and finishes

d)

Specifications

33.

Under BP 344, which of the following is NOT generally considered as a basic physical planning requirement?

a)

Durability

b)

Safety

c)

Accessibility

d)

Orientation

34.

Under the architect’s design-build services, which of the following conditions should be observed?

a)

Permits/licenses paid by architect

b)

Client appoints personnel/other support staff

c)

Personnel costs deducted from architect’s fee

d)

None of listed items

35.

Under the owner-architect agreement, which of the following is/are chargeable to the owner?

a)

Design of movable closets/cabinets

b)

Landscaping

c)

Taxes on services (except income tax)

d)

All listed items

36.

Who signs and seals as-built architectural plans, which are required for obtaining a certificate of occupancy?

a)

Structural engineer

b)

Contractor

c)

Architect

d)

Civil engineer

37.

Which compensation method for architect’s services establishes a fixed sum over and above reimbursement for architect’s technical time and overhead?

a)

Professional fee plus expenses

b)

Per diem plus reimbursable expense

c)

Percentage of construction cost

d)

Multiples of direct personnel expenses

38.

Under what condition may the contractor suspend work or terminate the contract?

a)

If the architect fails to act upon payment request within 15 days after the presentation of the said request.

b)

If the architect fails to act upon payment request within 25 days after the presentation of the said request.

c)

If the architect fails to act upon payment request within 6 months after the

d)

If the architect fails to act upon payment request within 3 months after the

39.

Your professional fee as an architect for the Pre-Design Services you provided for your client was agreed to be in a Multiple of Direct Personnel Expenses method, which was pegged at a 2.50 multiplier. As per your agreement, your hourly rate is to be computed at P1,000 per 8-hour working day, your consultants at P750 per 8-hour working day, and your technical researchers at P492 per 8-hour working day.

After the completion of the services, you submitted a report indicating the duration of your work and your out-of-pocket expenses:

Architect (You) @ 15 working days

Your consultants @ 4-1/2 working days

Your technical researchers @ 213 hours

Printing Costs @ P812.50

Transportation Costs @ P2,500.00

Communication Costs @ P3,211.25

Based on standards for such method of compensation, how much should you bill your client?

a)

Php 44,023.75

b)

Php 94,995.63

c)

Php 85,210.00

d)

Php 60,498.25

40.

The approved form of security furnished by the Contractor and his Surety as a guarantee of good faith on the part of the Contractor to pay all obligations arising from the Contract.

a)

Proposal Bond

b)

Performance Bond

c)

Payment Bond

d)

Guaranteed Bond

41.

A method of compensation dependent on the outcome of revenue, cost and profitability of a project.

a)

Rate Cost Method

b)

Percentage Fee Method

c)

Unit Cost Method

d)

Value Pricing Method

42.

If you were hired by a client to conduct an analysis of the space requirements for a certain project based on the organizational structure and functional set-up, linkages, and interaction of spaces, what scope of services should you provide for your client?

a)

Space Management Studies

b)

Architectural Programming

c)

Space Planning

d)

Architectural Research

43.

A subdivision developer engaged your professional services as an Architect to undertake their planned Housing Project involving a grand total of 67 units/lots (45 are inside lots, 14 are corner lots, and 8 are interior lots), all located on a 5-Ha. site in Batangas with the use of one (1) set of plans/design, specifications and related documents per unit type.

Based on your financial study with the developer, the construction cost for units situated on an inside lot is at P684,000.00; for units on a corner lot is at P912,000.00/unit; and for units on an interior lot is at P495,000.00/unit.

If your contract with the developer is only for Detailed Architectural Design Services, what would be your recommended professional fee as the Architect performing such service?

a)

Php 808,517.60

b)

Php 1,965,780.00

c)

Php 788,245.20

d)

Php 2,850,480.00

44.

Physical and systemic design undertaken by an Architect on a community, more comprehensive than, and an extension of the architecture of buildings, spaces between buildings, entourage, utilities and movement systems.

a)

Physical Planning

b)

Urban Design

c)

Site Planning

d)

Planning

45.

A few years ago, your services were hired on a Detailed Architectural and Engineering Design contract by a large corporate client for their P38,000,000 Packaging Plant project located in La Paz, Iloilo.

The same client now wants to expand their operations, this time, in Tuguegarao, Cagayan after acquiring a property of the same size as that in La Paz. Since the layout of their plant would be the same, your client wants to use the same plans and contract documents you have previously prepared for them a few years ago.

Presently, the cost of the planned Tuguegarao Plant was computed at 43% higher than the one in La Paz. If you decided to take on the said project, what then would be the Recommended Professional Fee (RPF), this time for Architectural Services only (excluding the Engineering services)?

a)

Php 802,080.00

b)

Php 1,630,200.00

c)

Php 490,200.00

d)

Php 1,270,800.00

46.

Which among the following methods of compensation for the Architect's Services can be categorized as a Percentage-based Fee?

a)

Lump Sum

b)

Salary Cost x Multiplier + Reimbursable Expenses

c)

Unit Cost Method

d)

Professional Fee + Expenses

47.

A specialized service of the Architect that are based on the concept of expanded physical planning services to include other activities necessary for the proper handling of numerous components considered in the formulation, implementation, and realization of a Master Development Plan (MDP). It covers the range of all services from primary data gathering through the formulation of the MDP and the parallel preparation of the environmental impact assessment/statement (EIA/S).

a)

Site and Physical Planning Services

b)

Site Development Planning (SDP) Services

c)

Comprehensive Development Planning (CDP) Services

d)

Master Development Planning (MDP) Services

48.

Which design phase of the Architect's regular scope of services does evaluating the Owner's program, schedule, budget, project site and proposes methods of project deliveries fall under?

a)

Schematic Design Phase

b)

Project Definition Phase

c)

Design Development Phase

d)

Bidding or Negotiation Phase

49.

You were hired by a Client for a project to provide Regular Design Services for Architectural work only. Your compensation is based on a lump sum amount of P531,029.23 for such services.

Meanwhile, the other allied professional and consultants were hired separately by your Client with the following contract price for their respective professional fees for the same project:

Structural Engineer = P242,111.15;

Master Plumber = P98,583.34;

Electrical Engineer = P141,029.02;

Mechanical Engineer = P59,009.00;

Landscape Architect = P54,852.00; and

Interior Designer = P59,014.04

What would be your grand total fee as the Architect of the project?

a)

Php 1,071,761.74

b)

Php 563,759.16

c)

Php 1,185,627.78

d)

Php 531,029.23

50.

A scope in the Architect’s Pre-Design Services involving analytical problem-seeking processes that lead to the statement and identification of both horizontal and vertical requirements in offering a solution. It includes a space program with characterizations of the envisioned spaces such as ambiance, cost range, etc.

a)

Space Planning

b)

Design Brief Preparation

c)

Feasibility Studies

d)

Architectural Programming