Agile Testing - Cross Skill Training

Total questions: 15

Worksheet time: 8mins

Name
Class
Date
1.

Software testing activities should start

a)

as soon as the code is written

b)

during the design stage

c)

when the requirements have been formally documented

d)

as soon as possible in the development life cycle

2.

Agile is

a)

A software development process

b)

An adjective

c)

A mindset

d)

A set of best practices

3.

Which of the following is NOT one of the Agile values?

a)

Individuals & Interactions

b)

Planning & Meeting

c)

Customer Collaboration

d)

Working Software

4.

In which order should tests be run?

a)

the most important tests first

b)

the most difficult tests first(to allow maximum time for fixing)

c)

the easiest tests first(to give initial confidence)

d)

the order they are thought of

5.

Agile testing is:

a)

The responsibility of the QA role

b)

A collaborative team effort

c)

Performed at the end of each sprint

d)

Not required until the hardening sprint

6.

100% requirements testing achieves good testing.

a)

True

b)

False

7.

Faults found by users are due to:

a)

Poor quality software

b)

Poor software and poor testing

c)

bad luck

d)

insufficient time for testing

8.

Zero defect code is a goal of Agile testing.

a)

True

b)

False

9.

What is not a agile testing tool

a)

Concordat

b)

Concordian

c)

Cucumber

d)

Ruby

10.

In a sprint, one story may be accepted, another in development and another in testing.

a)

True

b)

False

11.

 ___ Testing is a style of testing that lets testers follow their intuition — rather than a predefined path

a)

Unit Testing

b)

Monkey Testing

c)

Exploratory Testing

d)

Manual Testing

12.

____________is a process of developing software based on behavioral specification of software units

a)

TDD

b)

ATDD

c)

BDD

d)

None of the above

13.

BDD extends TDD by writing test cases in a natural language called 

a)

Jenkin

b)

Java

c)

Gherkin

d)

Cucumber

14.

When should you stop testing?

a)

when time for testing has run out.

b)

when all planned tests have been run

c)

when the test completion criteria have been met

d)

when no faults have been found by the tests run

15.

An incident logging system

a)

is of limited value

b)

is a valuable source of project information during testing if it contains all incidents

c)

should be used only by the test team.

d)

only records defects