Town Hall June 2022

Total questions: 20

Worksheet time: 7mins

Name
Class
Date
1.

Everyone is required to pass through the metal detector whenever entering/exiting the warehouse

a)

True

b)

False

2.

I can use my own personal lock to secure my locke

a)

False

b)

True

3.

If I forget my access card at home, I can get a temporary one at the security desk

a)

True

b)

False

4.

I can take the stairwells between the main floor and upstairs

a)

True

b)

False

5.

I can bring my lunch bag, backpack and coffee into the warehouse to my work-area and/or office

a)

False

b)

True

6.

What are the correct official CT communication vehicles we use for the GTA DC?

a)

Facebook

b)

Workplace

c)

Instagram

d)

Channel One

7.

DT stands for?

a)

Designated Trainee

b)

Designated Trainer

c)

Dirty Tank

d)

Drunken Tommy

8.

When was the voluntary tour for BDC and MDC employees?

a)

Saturday March 26

b)

Friday March 4

c)

Sunday March 27

d)

Saturday April 2

9.

What is the total length of fibre installed in the DC?

a)

120km

b)

450km

c)

680km

d)

1000km

10.

Which Project Manager is responsible for DC Implementations?

a)

Paul Hollingham

b)

Ahmad Bayan

c)

AJ Billes

d)

Raeanne Stevens

11.

Which project is responsible for MHE Testing?

a)

DCO

b)

DCM

c)

DCE

d)

BOPS

12.

How many Implementations are there for PHL?

a)

0

b)

1

c)

2

d)

3

13.

Who is part of the Command Centre?

a)

Program Manager

b)

OCM

c)

Implementation Lead

d)

All of the Above

14.

Which banners were descoped from the GTA DC IT project scope?

a)

INA

b)

National Sports

c)

Mark's Commercial

d)

All of the Above

15.

The pre-education program is delivered?

a)

At the same time as job specific training

b)

Prior to the job specific training

c)

After the job specific training

d)

There is no pre-education program

16.

BSO...stands for?

a)

Building Safety Orientation

b)

Building Safety Overview

c)

Building Safety Operations

d)

Blinding Sight Operation

17.

Prior to 2018 the GTA DC site was previously a...

a)

Garden centre

b)

Horse farm

c)

Canadian Tire store

d)

Golf course

18.

How many formal types of IT tests did the team go through?

a)

2

b)

4

c)

5

d)

3

19.

What was used to install the units on the roof top of the GTA DC building?

a)

Helicopter

b)

Tower crane

c)

L-Type Gantry crane

d)

Forklift

20.

Approximately how much concrete was poured in the foundations, footings and the floors at the GTA DC?

a)

33,000 m³

b)

89,000 m³

c)

53,000 m³

d)

44,000 m³