Font size
WorksheetsTown Hall June 2022
Total questions: 20
Worksheet time: 7mins
Everyone is required to pass through the metal detector whenever entering/exiting the warehouse
True
False
I can use my own personal lock to secure my locke
False
True
If I forget my access card at home, I can get a temporary one at the security desk
True
False
I can take the stairwells between the main floor and upstairs
True
False
I can bring my lunch bag, backpack and coffee into the warehouse to my work-area and/or office
False
True
What are the correct official CT communication vehicles we use for the GTA DC?
Workplace
Channel One
DT stands for?
Designated Trainee
Designated Trainer
Dirty Tank
Drunken Tommy
When was the voluntary tour for BDC and MDC employees?
Saturday March 26
Friday March 4
Sunday March 27
Saturday April 2
What is the total length of fibre installed in the DC?
120km
450km
680km
1000km
Which Project Manager is responsible for DC Implementations?
Paul Hollingham
Ahmad Bayan
AJ Billes
Raeanne Stevens
Which project is responsible for MHE Testing?
DCO
DCM
DCE
BOPS
How many Implementations are there for PHL?
0
1
2
3
Who is part of the Command Centre?
Program Manager
OCM
Implementation Lead
All of the Above
Which banners were descoped from the GTA DC IT project scope?
INA
National Sports
Mark's Commercial
All of the Above
The pre-education program is delivered?
At the same time as job specific training
Prior to the job specific training
After the job specific training
There is no pre-education program
BSO...stands for?
Building Safety Orientation
Building Safety Overview
Building Safety Operations
Blinding Sight Operation
Prior to 2018 the GTA DC site was previously a...
Garden centre
Horse farm
Canadian Tire store
Golf course
How many formal types of IT tests did the team go through?
2
4
5
3
What was used to install the units on the roof top of the GTA DC building?
Helicopter
Tower crane
L-Type Gantry crane
Forklift
Approximately how much concrete was poured in the foundations, footings and the floors at the GTA DC?
33,000 m³
89,000 m³
53,000 m³
44,000 m³