wayground logo

Free Printable Worksheets

Font size

S
M
L
XL
Worksheets

PDM Workshop Test

Total questions: 25

Worksheet time: 13mins

Name
Class
Date
1.

The _______________ is a process used in the software industry to produce and design high-quality software.

a)

Software Development Life Cycle

b)

Software Design Life Cycle

c)

Software Requirement Life Cycle

d)

None of the above

2.

Software Development Models are

a)

WaterFall Model

b)

Spiral Model

c)

Both a and b

d)

None of the above

3.

RAD Stands for

a)

Risk Application Development

b)

Requirement Application Development

c)

Rapid Application Development

d)

Real Application Development

4.

A demo model designed in software before the actual software installed is

a)

Proxy

b)

Prototype

c)

Project

d)

All the above

5.

 

Identify the simplest model of SDLC?

a)

Agile

b)

RAD

c)

Spiral

d)

Waterfall

6.

Which of the following is the first step of SDLC?

a)

Coding

b)

Preliminary Investigation and Analysis

c)

Design

d)

Testing

7.

Select the correct option which refers to internal software equality?

a)

Reusability

b)

Scalability

c)

Usability

d)

Reliability

8.

Choose the option which is not applicable to agile software development?

a)

Producing only the essential work products

b)

Recent Application Development

c)

Abolishing the project planning and testing

d)

None

9.

Activity diagram, use case diagram, collaboration diagram, and sequence diagram does fall under which type?

a)

non-behavioralnon-behavioral

b)

non-structural

c)

structural

d)

behavioral

10.

What are the notations for the Use case Diagrams?

a)

Use case

b)

Actor

c)

Prototype

d)

Use case and Actor

11.

Aggregation is_________

a)

set of relationship

b)

composed of relationship

c)

part of relationship

d)

All of these

12.

UML stands for _______

a)

Unified Method Language

b)

Unified Modeling Language

c)

Unstructured Modeling Language

d)

Unified Machine Language

13.

_________ are used to partition or group the related elements into one column.

a)

Activity

b)

Fork

c)

Swimlane

d)

Join

14.

In Software Testing life cycle which of the following stage will come  after Test Planning Stage?

a)

Test Execution

b)

Environment Setup

c)

Test Case Development

d)

Test Cycle Closure

15.

Which of the below testing is done at initial level of software testing?

a)

Integration Testing

b)

System Testing

c)

Unit Testing

d)

Performance Testing

16.

Integration Testing falls under

a)

Functional Testing

b)

Non-Functional Testing

c)

Formal Testing

d)

Simple Testing

17.

Black Box Testing is done by?

a)

Software Developers

b)

Software Testers

c)

Software Designers

d)

Software Tools Developer

18.

Perfomance Testing will come under which Type of Testing?

a)

Functional Testing

b)

Non-Functional Testing

c)

In Formal Testing

d)

Test Domain

19.

Java comes in Different Editions

a)

J2SE

b)

J2EE

c)

J2ME

d)

All the above

20.

To connect to the database in the backend from front end we require

a)

Appropriate Driver

b)

Appropriate Design

c)

Appropriate Development

d)

None of these

21.

Among the SDLC life Cycle Coding falls in ____ stage

a)

First

b)

Second

c)

Third

d)

Fourth

22.

Reuirements Phase exist in Testing also

a)

True

b)

False

23.

__________ study is vital for any project development

a)

Operational Feasibility

b)

Technical Feasibility

c)

Economical Feasibility

d)

All of these

24.

SRS stands for

a)

Software Requirement Specification

b)

Software Results Specification

c)

Software Role Specification

d)

Software Rejoin Specification

25.

To perform Software Testing we make use of tools

a)

True

b)

False