wayground logo

Free Printable Worksheets

NEW

Font size

S
M
L
XL
Worksheets

Lean test

Total questions: 8

Worksheet time: 4mins

Name
Class
Date
1.

3 categories of waste, which also known as 3M are as below, EXCEPT

a)

MUDA

b)

MUDI

c)

MURA

d)

MURI

2.

Which of the following is a type of waste ?

a)

Defect

b)

Waiting

c)

Extra Processing

d)

All Above

3.

While withdrawing money at the ATM, the customer enters the amount to be withdrawn on the ATM keypad'. What type of activity is this in the context of Lean?

a)

Waste

b)

Defect

c)

Value Adding

d)

Non Value Adding

4.

Which one of these is NOT included in 8 types of waste in Lean practice?

a)

Over Production

b)

Transportation

c)

Over Promise

d)

Motion

5.

In definition of waste, “Supply more than required / demand by customer or next process” refers to

a)

Defect

b)

Inventory

c)

Over Production

d)

Waiting

6.

Any movement of people that does not add value to the product or service' is an example of which type of waste?

a)

transportation

b)

Defect

c)

Motion

d)

Waiting

7.

How to classify an activity is a Value Add activity?

a)

It transform shape of material or information

b)

Customer wants it and willing to pay for it

c)

Done right the first time

d)

All of the above

8.

Which of these statement is NONE of Lean Principle

a)

Identify customers and their specific value

b)

Identify and map the value stream

c)

Create smooth flow by eliminating waste the process

d)

None of the above