wayground logo

Free Printable Worksheets

NEW

Font size

S
M
L
XL
Worksheets

INTEGRATIVE II UNIT 2

Total questions: 5

Worksheet time: 3mins

Name
Class
Date
1.

Document the electrical, electronic, mechanical, pneumatic, and hydraulic diagrams, the technical sheets of the equipment to be installed, security conditions, and observed regulations.

a)

Assembly of the measurement and control system.

b)

Automated control systems.

c)

Measurement and control systems.

d)

Monitoring of control variables

2.

Document control charts, calculations of the mean, standard deviation, control limits, and trend charts for process variables.

a)

Assembly of the measurement and control system

b)

Technical report.

c)

Calibration of instruments and measuring equipment.

d)

Monitoring of control variables.

3.

System of:

a)

System Manufacturing Processes.

b)

Automatic Control System.

c)

Measurement and Control Systems.

d)

Comunication System.

4.

Validation of the measurement and control system.

a)

Document control charts, calculations of the mean, standard deviation, control limits, and trend charts for process variables.

b)

Document the results of the startup, operation, and shutdown of a measurement and control system and the measurements made.

c)

Document the electrical, electronic, mechanical, pneumatic, and hydraulic diagrams, the technical sheets of the equipment to be installed, safety conditions, and observed regulations.

d)

Document an instrument setup procedure and its corresponding records.

5.

To correctly select an instrument, you must know the data of your processes or application where you want to install the equipment.

a)

Reasons for failure and how to prevent breakdowns in the process.

b)

Method validation.

c)

Selection criteria Measurement instruments.

d)

Monitoring of control variables.