wayground logo

Free Printable Worksheets

NEW

Font size

S
M
L
XL
Worksheets

PP SPP DOCUMENTS F-03

Total questions: 50

Worksheet time: 2hrs 40mins

Name
Class
Date
1.

What is the SPP DOC 204-A?

a)

Regular Design Services

b)

Post-Construction Services

c)

Full-Time Construction Services

d)

Construction Management Services

2.

What is the SPP DOC 203?

a)

Regular Design Services

b)

Specialized Architectural Services

c)

Full-Time Construction Services

d)

Construction Management Services

3.

What is the SPP DOC 204-B?

a)

Specialized Architectural Services

b)

Full-Time Construction Services

c)

Construction Management Services

d)

Post-Construction Services

4.

What is the SPP DOC 205?

a)

Specialized Architectural Services

b)

Full-Time Construction Services

c)

Construction Management Services

d)

Post-Construction Services

5.

What is the SPP DOC 206?

a)

Comprehensive Architectural Services

b)

Design Build Services

c)

Architectural Design Competition

d)

Professional Architectural Consulting Services

6.

What is the SPP DOC 207?

a)

Comprehensive Architectural Services

b)

Design-Build Services

c)

Architectural Design Competition

d)

Professional Architectural Consulting Services

7.

What is the SPP DOC 208?

a)

Comprehensive Architectural Services

b)

Design Build Services

c)

Architectural Design Competition

d)

Professional Architectural Consulting Services

8.

What is the SPP DOC 209?

a)

Comprehensive Architectural Services

b)

Design Build Services

c)

Architectural Design Services

d)

Professional Architectural Consulting Services

9.

In what SPP Document do the services of architectural interiors, acoustic design, architectural lighting layout and design, and site development planning are covered?

a)

SPP DOC 201

b)

SPP DOC 202

c)

SPP DOC 203

d)

SPP DOC 205

10.

A service that involves the detailed planning and design of indoor/enclosed areas of any proposed building/structure.

a)

Architectural Interior Services

b)

Acoustic Design Services

c)

Architectural Lighting Layout and Design

d)

Site Development Planning Services

11.

A service that involves the detailed planning and design to control sound transmission for compatibility with the architectural design concept.

a)

Architectural Interior Services

b)

Acoustic Design Services

c)

Architectural Lighting Layout and Design

d)

Site Development Planning Services

12.

A service that involves the detailed planning and design of light transmission timing and control for compatibility with the architectural design concept.

a)

Architectural Interior Services

b)

Acoustic Design Services

c)

Architectural Lighting Layout and Design

d)

Site Development Planning Services

13.

A service that involves space planning, architectural lay-outing and utilization of spaces within and surrounding a specific building in relation with the existing natural and built environment.

a)

Architectural Interior Services

b)

Acoustic Design Services

c)

Architectural Lighting Layout and Design

d)

Site Development Planning Services

14.

Prescribes space plans, stacking diagrams/sections and computations of areas for the different activities and spaces to be integrated in a building project.

a)

Architectural Interior Services

b)

Acoustic Design Services

c)

Architectural Lighting Layout and Design

d)

Site Development Planning Services

15.

Lays out and prescribes furniture/built-ins/equipment for the project and prepares specs for AI components.

a)

Architectural Interior Services

b)

Acoustic Design Services

c)

Architectural Lighting Layout and Design

d)

Site Development Planning Services

16.

Service where the architect prepares drawings and specifications for acoustic design and treatment, sound control and reinforcement, sound absorption, reflectance, insulation, etc.

a)

Architectural Interior Services

b)

Acoustic Design Services

c)

Architectural Lighting Layout and Design

d)

Site Development Planning Services

17.

Service where the architect prepares the drawings and specifications for lighting design, illumination, fixture placement, efficiency, energy considerations, etc.

a)

Architectural Interior Services

b)

Acoustic Design Services

c)

Architectural Lighting Layout and Design

d)

Site Development Planning Services

18.

Service where the architect prepares the design of the surrounding that will make the space fit for a specific mood and for the required activities.

a)

Architectural Interior Services

b)

Acoustic Design Services

c)

Architectural Lighting Layout and Design

d)

Site Development Planning Services

19.

Service where the architect conceptualizes the entire site development plan including the generic scope of softscape and hardscape requirements.

a)

Architectural Interior Services

b)

Acoustic Design Services

c)

Architectural Lighting Layout and Design

d)

Site Development Planning Services

20.

Service where the architect conceptualizes the specifications for the needed civil works and utility lines.

a)

Architectural Interior Services

b)

Acoustic Design Services

c)

Architectural Lighting Layout and Design

d)

Site Development Planning Services

21.

Service where the architect assists the client in bidding out the work with landscape, watescape, rock formation contractors etc.

a)

Architectural Interior Services

b)

Acoustic Design Services

c)

Architectural Lighting Layout and Design

d)

Site Development Planning Services

22.

In AI, AD, AL, and SDP, the RPF for the cost of work is _____.

a)

5% to 10%

b)

10% to 15%

c)

15% to 20%

d)

20% to 25%

23.

In AI, AD, AL, and SDP, the fee upon submission of the preliminary design is _____ of RPF.

a)

10%

b)

20%

c)

30%

d)

50%

24.

In AI, AD, AL, and SDP, the fee upon submission of the final design is _____ of RPF.

a)

10%

b)

20%

c)

30%

d)

50%

25.

In AI, AD, AL, and SDP, the fee upon completion of the project is _____ of RPF.

a)

10%

b)

20%

c)

30%

d)

50%

26.

Coordinating and relating the work of a separate Specialist Consultant to the design concept of the architect will be what percent of the SC's fee?

a)

5%

b)

10%

c)

15%

d)

20%

27.

The total cost of all the fixture and accessories used or installed in the project.

a)

Cost of Construction

b)

Cost of Installation

c)

Cost of Work

d)

None of the Above

28.

__________ includes Master Development Planning, Subdivision Planning, and Urban Design.

a)

Site Planning Services

b)

Physical Planning Services

c)

All of the Above

d)

None of the Above

29.

It refers to the orderly arrangement within a piece of land or property where vertical and horizontal developments are to be proposed.

a)

Physical Planning

b)

Urban Design

c)

Site Planning

d)

NOTA

30.

It is concerned with the general quality of the settings for people and their activities, buildings and other natural and man-made phenomenon.

a)

Physical Planning

b)

Urban Design

c)

Site Planning

d)

NOTA

31.

It is the composite arrangement of several buildings and their requisite amenities, facilities, services and utilities within a natural or built setting.

a)

Physical Planning

b)

Urban Design

c)

Site Planning

d)

NOTA

32.

1 hectare is equivalent to __________.

a)

1 000 sqm

b)

10 000 sqm

c)

100 000 sqm

d)

100 sqm

33.

The RPF for site and physical planning services is __________ net to the architect.

a)

Php 50 000 / has for the first 5 has

b)

Php 5 / sqm for the first 50 000 sqm

c)

All of the Above

d)

None of the Above

34.

For Site and Physical Planning Services, the Framework Development Plan (FRDP) fee is _____ of RPF.

a)

10%

b)

20%

c)

30%

d)

50%

35.

For Site and Physical Planning Services, the Conceptual Master Development Plan (CMDP) fee is _____ of RPF.

a)

10%

b)

20%

c)

30%

d)

50%

36.

For Site and Physical Planning Services, the Preliminary Master Development Plan (PMDP) fee is _____ of RPF.

a)

10%

b)

20%

c)

30%

d)

50%

37.

For Site and Physical Planning Services, the Detailed Master Development Plan (DMDP) fee is _____ of RPF.

a)

10%

b)

20%

c)

30%

d)

50%

38.

It is concerned with the management and use of land as well as the conservation , preservation and upgrading of the human environment.

a)

Comprehensive Development Planning

b)

Development Planning

c)

Master Development Planning

d)

None of the Above

39.

It is based on the concept of expanded physical planning services to include other activities necessary for the formulation, implementation, and realization of MDP.

a)

Comprehensive Development Planning

b)

Development Planning

c)

Master Development Planning

d)

None of the Above

40.

It may place heavy emphasis on the non-physical / non-engineering components of the development plan.

a)

Comprehensive Development Planning Services

b)

Development Planning Services

c)

Master Development Planning Services

d)

None of the Above

41.

It puts a premium on the physical planning and engineering components of the development plan.

a)

Comprehensive Development Planning Services

b)

Development Planning Services

c)

Master Development Planning Services

d)

None of the Above

42.

Land use and the changes which occur within the physical environment represented mainly by the MDP.

a)

Physical Component

b)

Transport Component

c)

Economic Component

d)

Socio-cultural Component

e)

Legal and Administrative Component

43.

Road and transport networks, land-sea-air linkages, the movement of people and goods from one place to another.

a)

Physical Component

b)

Transport Component

c)

Economic Component

d)

Socio-cultural Component

e)

Legal and Administrative Component

44.

The LGU's assets and its management.

a)

Physical Component

b)

Transport Component

c)

Economic Component

d)

Socio-cultural Component

e)

Legal and Administrative Component

45.

The people, their living conditions, and the seeking of ways to ameliorate it.

a)

Physical Component

b)

Transport Component

c)

Economic Component

d)

Socio-cultural Component

e)

Legal and Administrative Component

46.

The relationship of adopted development proposals and policies to existing laws.

a)

Physical Component

b)

Transport Component

c)

Economic Component

d)

Socio-cultural Component

e)

Legal and Administrative Component

47.

It provides research, assessment, recording, management, interpretation, and conservation of historical heritage.

a)

Historic Conservation

b)

Heritage Conservation

c)

Historic and Heritage Conservation and Planning

d)

All of the Above

48.

Practice that arranges and formulates methods of rating and ascerting the value of structures of facilities which must be fully secured, kept safe, protected.

a)

Security Evaluation and Planning

b)

Building Systems Design

c)

Facilities Maintenance Support

d)

Building Testing and Commissioning

49.

It engages in methods of producing building components in a highly engineered, efficient and cost-effective manner.

a)

Security Evaluation and Planning

b)

Building Systems Design

c)

Facilities Maintenance Support

d)

Building Testing and Commissioning

50.

It provides the means and measures to ensure the proper function and maintenance of the building and site after final inspection.

a)

Security Evaluation and Planning

b)

Building Systems Design

c)

Facilities Maintenance Support

d)

Building Testing and Commissioning