wayground logo

Free Printable Worksheets

NEW

Font size

S
M
L
XL
Worksheets

EIA-1

Total questions: 15

Worksheet time: 5mins

Name
Class
Date
1.

The following are the line bureau of DENR, except one.

a)

Land Management Bureau

b)

Forest Management Bureau

c)

Mines and Geosciences Bureau

d)

Biodiversity, Ecosystems Research and Development Bureau

e)

Environmental Management Bureau

2.

The following are the EMB mandates, except one.

a)

Philippine Environmental Impact Statement System (PD 1586)

b)

Philippine Clean Air Act

(RA 8749)

c)

Philippine Clean Water Act

(RA 9275)

d)

Environmental Education Act

(RA 9512)

3.

The Department Administrative Order that requires all establishment with environmental permits and clearances to have their Pollution Control Officer.

a)

DAO 2014-001

b)

DAO 2014-002

c)

DAO 2014-003

d)

DAO 2014-004

4.

This Republic Act requires all establishment/individual to secure environmental permits for air pollution source installation.

a)

RA 9275

b)

RA 6969

c)

RA 9003

d)

RA 8749

5.

It is a process that involves evaluating and predicting the likely impacts of a project (including cumulative impacts) on the environmental during construction, commissioning, operation and abandonment.

a)

Environmental Compliance Certificate

b)

Environmental Impact Statement

c)

Environmental Impact Assessment

d)

Certificate of Non-Coverage

6.

It is the output of a comprehensive study of the significant impacts of a project on the environment.

a)

Environmental Impact Statement

b)

Environmental Impact Assessment

c)

Environmental Impact Statement System

d)

Environmental Compliance Certificate

7.

The following are the four fold consideration for a satisfactory EIS, except one.

a)

The project description

b)

Environmental baseline study

c)

The project environmental impact of the project

d)

Proposed environmental assessment plan

8.

A Memorandum Circular for Coverage Screening and Standardized Requirements for projects covered by PD 1586.

a)

EMB MC 003, series of 2014

b)

EMB MC 004, series of 2014

c)

EMB MC 005, series of 2014

d)

EMB MC 006, series of 2014

9.

It is an establishment of an Environmental Impact Statement System, including other environmental management related measures and for other purposes.

a)

PD 1151

b)

PD 1152

c)

PD 1586

d)

PD 984

10.

All areas declared by law as national parks, watershed reserves, wildlife preserves, and sanctuaries

a)

Environmentally Critical Area

b)

Protected Area

c)

Environmentally Critical Project

d)

Easement Area

11.

These are projects or programs that have high potential for significant negative environmental impact as defined under Presidential Proclamation 2146 (1981).

a)

Environmentally Critical Areas

b)

Environmentally Critical Projects

c)

Environmentally Critical Programs

d)

Environmental Compliance Certificate

12.

The following are Environmentally Critical Projects, except one.

a)

Metal Industries

b)

Iron and Steel Mills

c)

Petroleum Stations

d)

Smelting Plants

13.

What is the documentary requirement of Category B project?

a)

EIS

b)

EIS/IEE Checklist Report

c)

Project Description

d)

Project Fact Sheet

14.

What section describes the Fines, Penalties and Sanctions for any person, corporation or partnership found violating PD 1586?

a)

Section 4

b)

Section 5

c)

Section 6

d)

Section 7

15.

Which of the following is not a scope of the violations of PD 1586?

a)

Covered projects established and/or operating w/o ECCs

b)

Violations of ECC Conditions, EMP/EMoP and other commitments as specified in the EIA Report

c)

Misrepresentation in the EIA Report or any other EIA documents

d)

Implementation of project after the issuance of ECC