To ensure compliance of the provisions of this Code, the professional services of a Registered and Licensed Master Plumber shall be enlisted in accordance with Republic Act No. 1378, the "_____".
Plumbing Law
Plumbing Code
No permit shall be issued to any person, firm or corporation, to do or cause to be done any installation of plumbing work regulated by this Code, except to a Registered and Licensed Master Plumber, holding a valid, ______ as required by Republic Act No. 1378, as amended .
unexpired and unrevoked certificate of registration
Updated Cedula
All plumbing plans, drawings. diagrams, design analyses/computations as required, technical specifications, bills of materials and other required documents for all types of occupancy shall be prepared, signed and sealed by a________and shall be submitted in six (6) sets of the aforementioned requirements with each application for a permit.
Registered and Licensed Architect.
Registered and Licensed Master Plumber. without limitations. pursuant to Republi~ Act 1378, as amended.
_____ shall file an application at the Office of the Building Official in behalf of the building Owner for whom such work shall be done and shall till out the forms provided for that purpose.
A Registered and Licensed Master Plumber
Owner
The______submitted shall comply with the provisions of existing standards of the National Building Code and this Code.
technical specifications
plumbing plan
When the Administrative Authority issues the permit he shall endorse in writing or stamp the plans and specifications as "_____". Such approved plans and specifications shaH not be changed, modified or altered without authorization from the Administrative Authority and aU works shall be done in accordance with approved plans and specifications.
APPROVED
VALID
The Administrative Authority may issue a ______ for the construction of a part of a large and/or complicated plumbing system before the entire plans and specifications for the whole system have been submitted or approved, provided adequate information and detailed statements have been filed, complying with all pertinent requirements of this Code.
Partial Permit
Temporary Permit
The holder of such partial permit may proceed at his own risk _____ that the final permit for the entire building, structure or plumbing system will be granted.
without assurance
guaranteed
Retention of Plans- One set of approved plans, specifications, computations and related data shall be retained by the Administrative Authority. _____sets of approved plans, specifications and data shall be returned to the applicant and Owner, one ( 1) set of which shall be kept at the jobsite at all times while the work is in progress.
Two (2)
for owner
one (1)
for owner
A plumbing permit issued under the provisions of this Code shall expire and become null and void if the plumbing work authorized therein is not commenced within _____ from the date of such permit or if the plumbing work so authorized is suspended or abandoned at any time after having been commenced for a period of 120 days.
one year
120 days
the plumbing work so authorized is suspended or abandoned at any time after having been commenced for a period of _____ days.
120
90
administrative Personnel, Plumbing lnspector shall be a Registered and Licensed Master Plumber in accordance with the provision of Republic Act 378, otherwise, known as "___··.
Plumbing Law
Building Code
The application, plans technical specifications and other required documents filed by an applicant for a permit shall be reviewed by the ___
Administrative Authority
Registered Master Plumber
In case of renewal of a plumbing permit, a fee equivalent to ____ the amount of the original fee shall be paid.
one-half
one-third
The Administrative Authority may, in writting, _____ a permit issued under the provisions of this Code whenever issued in error or on the basis of incorrect information supplied or in violation of pertinent ordinances, rules and regulations.
suspend or revoke
total demolition
The ___ or his designated agent shall be responsible for the maintenance of plumbing systems.
owner
plumber
Plumbing systems, which are part of buildings or structures in one place and moved into another Jurisdiction. shall comply with the provisions of this Code for _____.
new installation
asbuilt
The ______ or his representative shalt not be liable for expenses incurred in the removal and replacement of materials required to warrant proper inspection.
Administrative Authority
Master Plumber
Owner
When the installation of a plumbing system is complete, ____ shall be made.
additional and final inspection
occupancy permit
All plumbing systems shall be ____ as required by this Code or the Administrative Authority.
tested and approved
Checked and Approved
Well operated
no person shall install connections to any water supply line, sewer or storm drain systems as required by this Code and for which other applications and permits are also required from other Agencies before approval by the ____.
Administrative Authority
Owner
________shall be a Registered and Licensed Master Plumber in accordance with the provision of Republic Act 1378, otherwise, known as "Plumbing Law··.
all administrative Plumbing Personnel, plumbing Inspector
Not all all administrative Plumbing Personnel, plumbing Inspector
Administrative Authority not more than _____hours after such replacement work is completed and before any portion of such plumbing system is concealed by any permanent portion of the building.
72 hours
120 hours
The ______or his representative shalt not be liable for expenses incurred in the removal and replacement of materials required to warrant proper inspection.
Administrative Authority
owner
All _____ in accordance with the provisions of Republic Act No. 1378 shall secure for themselves a seal of the standard size and type as required.
Licensed Master Plumbers registered
Plumbers
It shall be unlawful for any person, firm or corporation, whether acting as
principal, setvant, agent or employee, to do or cause to be done any plumbing or
drainage work for which a permit is required without securing prior permit from
the Office of lhe Building Official having jurisdiction _____
under the Department of
Public Works and Highways, Department of Interior & Local Government or
City Mayors.
under barangay councel and city mayor
The technical specifications submitted shall comply with the provisions of
existing standards of the ____
Plumbing Code and this Code.
National Building Code and this Code.
-One set of approved plans, specifications, computations and
related data shall be retained by the Administrative Authority.
-Two (2) sets of
approved plans, specifications and data shall be returned to the applicant a!ld
Owner,
- one ( 1) set of which shall be kept at the jobsite at all times while the work
is in progress.
Retention of Plans
Validity of Permit
The ____ or his designated agent shall be responsible for the
maintenance of plumbing systems.
master plumber
owner
all administrative plumbing Personnel, plumbing inspector shall be a Registered
and Licensed Master Plumber in accordance with the provision of
______, otherwise, known as "Plumbing Law"
Republic Act 1378
Republic Act 1398
1. Registered and Licensed Master Plumber at upper portion of the round
seal.
2. Name of Registered and Licensed Master Plumber at the upper center.
3. The registration number shall appear at the center below the name.
4. Philippines, appearing at the lower portion of the round seat
The seal
shall be round in shape and shall be inscribed
The seal
shall be square in shape and shall be inscribed
The issuance of a permit based on submitted plans. specifications or other documents shall not prevent the ______ from thereafter requiring the correction of errors on said plans, specifications and other documents . and from stopping an on-going plumbing installations violative of this Code or of other pertinent ordinances of this Jurisdiction.
Administrative Authority
Master Plumber
The Administrative Authority may, in writing _____ a permit issued under the provisions of this Code whenever issued in error or on the basis of incorrect information supplied or in violation of pertinent ordinances, rules and regulations.
suspend or revoke
Warning letter
may be made to any existing plumbing system provided the addition, alteration or repair works conform to requirements for a new plumbing system
Additions, Alterations or Repain
Changes in Building Occupancy
shall not render an existing system unsafe, unsanitary or overloaded.
Additions, alterations or repairs
Changes in Building Occupancy
Plumbing systems which are a part of any building or structure undergoing a change in use or occupancy, as defined in the National Building Code, shall comply with all requirements of this Code
Changes in Building Occupancy
Additions, Alterations or Repain
No portion of any plumbing system shall be concealed until _____
inspected and approved.
permit released
Plumbing systems regulated by this Code shall not be connected to the ______ supplies nor to the sewer system until authorized by the Administrative Authority and other Agencies concerned.
water and energy fuel
water and sanitary
The Administrative Authority requires that every request for inspection be filed atleast _____ before such inspection is intended.
Such request shall be in writing and jointly signed by the Owner and the Registered and Licensed Master Plumber- Contractor.
three (3) working days
five (five) working days
Each building shall be provided with sanitary facilities in accordance with best practice for ______ as provided in the National Building Code of the Philippines or by other government departments having jurisdiction
mobility of disabled persons
mobility of every persons
_____shall be charged when the approved plans are not readily available to the Inspector, for failure to provide access and facility on the date when the inspection is requested, or for deviating from plans requiring the approval of the Administrative Authority.
Re-inspection fees
Re-application fees