wayground logo

Free Printable Worksheets

Font size

S
M
L
XL
Worksheets

Kanban

Total questions: 19

Worksheet time: 9mins

Name
Class
Date
1.

Lequel de ces éléments n’est pas une caractéristique des équipes Scrum?

a)

Experts

b)

Auto-organisation

c)

Polyvalents

d)

Méchant

2.

Quels sont les principaux rôles de Scrum ?

a)

Product owner, Scrum master et l’équipe de développement

b)

Coach agile, Scrum master et l’équipe de développement

c)

Product owner, Scrum master et Sponsor d’affaires

d)

Partenaires de contrôle, Scrum master et l’équipe de développement

3.

Comment rédiger les User Stories ?

a)

Le système doit _______

b)

Étant donné_______quand_______alors_______

c)

En tant que_______, je souhaite_______, afin de_______

d)

Si les entrées_______alors les sorties_______

4.

What are the different Scrum events?

a)

Stand-up, group coding, backlog refinement, Sprint retrospective.

b)

Daily Scrum, group coding, backlog refinement, Sprint retrospective.

c)

Daily Scrum, Sprint review, backlog refinement, Sprint retrospective.

d)

Daily Scrum, Sprint Review, Sprint Planning, Sprint Retrospective.

5.

Kanban works only for IT operations

a)

Vrai

b)

Faux

6.

Kanban makes sure people are busy.

a)

True

b)

False

7.

Kanban is only for project management

a)

False

b)

True

8.

Who is Reported IN JIRA

a)

The person who has to solve the issue

b)

The person who can generate reports

c)

The person who raises the issue

d)

The person who can view the issue

9.

What action is to be done on the issue assigned to you after fixing.

a)

Close

b)

Link

c)

Move

d)

Resolve

10.

Who can create an issue in JIRA?

a)

Project Admin

b)

Developer

c)

User

d)

All of Above

11.

Can you resolve any issue not assigned to you?

a)

True

b)

False

12.

The issue with this priority must be fixed first.

a)

Major

b)

Critical

c)

Blocker

d)

Trivial

13.

Can you assign an issue to yourself?

a)

True

b)

False

14.

Which of the following is not an issue type?

a)

Epic

b)

Minor

c)

Sub-task

d)

Story

15.

If you want to assign the issue to a particular person in the team, then you mention his/her name as _____ while creating the issue.

a)

Assigner

b)

Person

c)

Assignee

d)

None of these

16.

Sprint planning is limited to a maximum of ____

a)

4hours

b)

15minutes

c)

8hours

d)

6hours

17.

Daily stand up meetings should be no longer than ____

a)

2 hours

b)

15 minutes

c)

30 minutes

d)

20 minutes

18.

What is the correct answer

a)

Sprint Review befor Sprint Retrospective

b)

Sprint Planning after Sprint Backlog

c)

a Sprint can take 1~4 week

d)

A new Sprint starts immediately after the conclusion of the previous Sprint

19.

Sprint retrospectives are limited to a maximum of

a)

3 hours

b)

4 hours

c)

45 minutes

d)

2 hours