1.

In SAFe, the Innovation and Planning (IP) Iteration occurs

a)

Every Iteration

b)

Every Quarter

c)

Every PI

2.

PI System Demo is led by

(select all that applies)

a)

Product Management

b)

Product Owners

c)

The System Team

d)

Scrum Masters

3.

The PO sync provides visibility into 

a)

How well the ARC is progressing

b)

How well the ART is progressing

c)

 How well the SOS is progressing

d)

How well the Iteration is progressing

4.

System Demos Best approach is

a)

POs and PMs see things for the first time in the System Demo

b)

Team members are not invited to the System Demo to save time

c)

Make sure the right participants are present

d)

lot of time is spent preparing for the demo

5.

What are three parts of Inspect and Adapt (I&A):

(Select three options)

a)

The PI System Demo

b)

The Iteration demo

c)

Quantitative and Qualitative Measurement

d)

Problem-Solving Workshop

e)

Iteration retrospective