wayground logo

Free Printable Worksheets

NEW

Font size

S
M
L
XL
Worksheets

Quality Assurance

Total questions: 10

Worksheet time: 10mins

Name
Class
Date
1.

An important benefit of implementing a HACCP system in a food business is

a)

reduced employee wages

b)

increased consumer confidence

c)

reduced employer support

d)

increased food wastage

2.
A new restaurant decides to develop a HACCP Plan- the First Step is
a)
Monitor
b)
Verify
c)
Hire a consulting company
d)
Conduct a Hazard Analysis
3.

A decision tree is

a)

a tool to help identify CCP's

b)

the only method to identify ICP's

c)

a legal requirement to use to control CCP's

d)

an accurate method to identify all control points

4.

Recording temperatures from the oven, every hour is following which HAACP plan?

a)

Record keeping

b)

Monitoring

c)

Verifying

d)

Critical control limits

5.
Reviewing temperature logs and other records to make sure that the HACCP plan is working as intended is an example of which HACCP principle?
a)
Monitoring
b)
Verification
c)
Hazard Analysis
d)
Record keeping
6.
The temperature of a pot of beef stew is checked during holding.  The stew has not met the critical limit and is thrown out according to house policy.  Throwing out the stew is an example of which HACCP principle?
a)
Monitoring
b)
Verification
c)
Hazard analysis
d)
Corrective Action
7.

Total Quality Management Focuses on

a)

Employee

b)

Customer

c)

Employee and Customer

d)

None of the Above

8.

The following statements are the importance of GMP EXCEPT

a)

To comply to the domestic and international standard

b)

To enhance the credibility and image of the food industry.

c)

To increase consumer confidence

d)

To ensure HALAL food

9.

What is the Hazard ?

a)

is a condition, property or situation with the potential for loss

b)

Risk is a function of the probability of contact with (or exposure to) a hazard

c)

Risk evaluation of identified hazards taking into account the existing controls and defences

d)

Risk assessment of hazards identified through a review of the potential unsafe-acts

10.

What is the Risk?

a)

Risk evaluation of identified hazards taking into account the existing controls and defences

b)

Risk is a function of the probability of contact with (or exposure to) a hazard, multiplied by the likely severity of the consequences of that contact or exposure.

c)

Controls are the precautions taken to prevent or reduce the risk of a hazard

d)

is one where additional control measures are required to eliminate or reduce the risk of loss