ENG4216

Total questions: 30

Worksheet time: 1hrs 28mins

Name
Class
Date
1.

Lock out / tag out is the procedure.

a)

To keep the machines in lock forever

b)

To put tags with names of machine parts

c)

To carry out maintenance jobs safely

d)

To get permission for maintenance job

2.

If you see damaged a wire during maintenance job then what action shall you take.

a)

Replace the damaged wire with any wire

b)

Ignore the damage and cover it with other wires

c)

Just put a warning label

d)

Repair it as per the manufacturer standards without reducing the protection

3.

What preparations must be made before work to handle any emergency?

a)

Locate nearest first aid and firefighting equipment

b)

Locate nearest bathroom

c)

Locate nearest mall

d)

Locate nearest cafeteria

4.

Work permit is a document used to;

a)

Estimate the cost of any maintenance

b)

Take permission to start any maintenance work

c)

Ensure the availability of spare parts needed for maintenance

d)

Describe the skills of the technicians doing maintenance work

5.

How to get authorization to carry out any maintenance work in industry?

a)

By taking verbal permission

b)

By asking your supervisor on email

c)

By using work permit form

d)

By asking any colleague

6.

A step up transformer;

a)

Decrease the voltage at output

b)

Keep the voltage same at input and output

c)

Increase the voltage at output

d)

Changes the voltage all the time

7.

Basic construction of transformer contains three parts, which are;

a)

Primary winding, Secondary Winding and Rotor

b)

Rotor, Stator and Winding

c)

Primary winding, Secondary Winding and Iron core

d)

Armature, Shaft and bearings

8.

A transformer used to transfer complex signals, containing large number of frequencies, form one circuit to another is called;

a)

Signal Transformer

b)

Power Transformer

c)

Auto Transformer

d)

Instrument Transformer

9.

Which of the following turns ratio is considered a “step down” transformer?

a)

2 : 3

b)

2 : 5

c)

10 : 1

d)

1 : 1

10.

Power loss caused by magnetism that remains in a material after the magnetizing force has been removed is called;

a)

Eddy current loss

b)

Hysteresis loss

c)

Resistive loss

d)

Dielectric loss

11.

What type of power transformer installation is commonly used for industrial applications?

a)

Delta – Star (Δ - Y)

b)

Star – Delta (Y - Δ)

c)

Star – Star (Y - Y)

d)

Delta – Delta (Δ - Δ)

12.

What type of power transformer installation is commonly used for interior wiring systems?

a)

Delta – Star (Δ - Y)

b)

Star – Delta (Y - Δ)

c)

Star – Star (Y - Y)

d)

Delta – Delta (Δ - Δ)

13.

Describe the construction type of 3 phase transformer shown in the picture.

a)

Air core

b)

Core type

c)

Shell type

d)

None of the choices

14.

What is the connection type of 3 phase transformer as shown in the figure?

a)

Star Delta

b)

Star Star

c)

Delta Star

d)

Delta Delta

 

15.

Which 3phase transformer is used to convert 3-wire system to 4-wire system with neutral available.

a)

Delta – Star (Δ - Y)

b)

Star – Delta (Y - Δ)

c)

Star – Star (Y - Y)

d)

Delta – Delta (Δ - Δ)

16.

What is the function of oil in a transformer?

a)

for cooling and insulation

b)

for hydraulic functions

c)

for reducing friction between moving parts

d)

for load balancing

17.

Which of the following testing that will check the insulation integrity of the transformer?

a)

insulation resistance test

b)

winding resistance test

c)

short circuit test

d)

voltage test

18.

Which of the following is a requirement for the parallel operation of transformers?

a)

The same bushings

b)

The same weight

c)

The same price tag

d)

The same percent impedance

19.

The leads from the primary and secondary windings must be safely brought out of the transformer’s tank to form a terminal connection point for the line and load connections. This is done by using a component called ____

a)

Bushings

b)

control panel

c)

Terminal Block

d)

Switches

20.

What type of transformer cooling is described in the picture?

a)

ONAN

b)

ONAF

c)

OFAF

d)

ODAF

21.

What type of transformer cooling is described in the picture?

a)

ONAN

b)

ONAF

c)

OFAF

d)

OFWF

22.

The voltage between any two lines of 3 phase circuit is called ______.

a)

line voltage

b)

phase voltage

c)

open circuit voltage

d)

short circuit voltage

23.

In a 3-phase, Star (Y) system, the voltage between any line and neutral is called ____

a)

line voltage

b)

phase voltage

c)

open circuit voltage

d)

short circuit voltage

24.

Determine the current in the secondary circuit of transformer as shown.

a)

10A

b)

1A

c)

5A

d)

0A

25.

Determine the voltage across the load in the transformer circuit shown.

a)

120V

b)

12V

c)

10V

d)

1V

26.

In a 3phase, delta-star (Y) connected transformer, if the secondary line-to-line voltage is 415V, what is the phase voltage on the secondary?

a)

239.6V

b)

415V

c)

127.5V

d)

718.8V

27.

What is the primary impedance of a transformer with a secondary impedance of 100 Ω and a turns ratio of 100:1?

a)

1 kΩ

b)

1 MΩ

c)

100 Ω

d)

10 Ω

28.

What is the turn’s ratio of a transformer that has primary voltage of 600 V and secondary voltage of 100 V?

a)

6:1

b)

5:1

c)

3:1

d)

10:1

29.

Transformers are rated in terms of _____

a)

Watts (W)

b)

Volt-ampere (VA)

c)

horsepower (hp)

d)

Reactive volt-ampere (VAR)

30.

A transformer used to step up or step down the voltage in transmission/distribution systems, is called ____

a)

power transformer

b)

instrument transformer

c)

audio transformer

d)

auto-transformer