Wayground logo

Free Printable Worksheets

Font size

S
M
L
XL
Worksheets

ASAD Quiz 1B

Total questions: 14

Worksheet time: 14mins

Name
Class
Date
1.

In an information system, data is information that has been transformed into input that is valuable to users

a)

TRUE

b)

FALSE

2.

A business profile is a specific set of transactions, events, and results that can be described and documented

a)

TRUE

b)

FALSE

3.

Business process modeling notation (BPMN) includes standard shapes and symbols to represent events, processes, workflows, and more

a)

TRUE

b)

FALSE

4.

The waterfall model emphasises interactivity among the phases

a)

TRUE

b)

FALSE

5.

A business profile is an overview that describes a company’s overall functions, processes, organization, products, services, customers, suppliers, competitors, constraints, and future direction

a)

TRUE

b)

FALSE

6.

_____ is a systems development technique that tests system concepts and provides an opportunity to examine input, output, and user interfaces before final decisions are made

a)

scrum

b)

prototyping

c)

modeling

d)

rapid application development

7.

Identify a method of developing systems that is well-suited to traditional project management tools and techniques

a)

rapid application development

b)

object-oriented

c)

adaptive method

d)

structured analysis

8.

Structured analysis is called a(n) _____ technique because it focuses on processes that transform data into useful information.

a)

iterative

b)

process-centered

c)

inferred

d)

model specific

9.

The _____ usually begins with a formal request to the IT department, called a systems request, which describes problems or desired changes in an information system or a business process

a)

system design phase

b)

system support and maintenance phase

c)

system planning phase

d)

system analysis phase

10.

The _____ usually begins with a formal request to the IT department, called a systems request, which describes problems or desired changes in an information system or a business process

a)

system design phase

b)

system support and maintenance phase

c)

system planning phase

d)

system analysis phase

11.

In a systems development life cycle (SDLC) model, the purpose of the _____ is to build a logical model of the new system.

a)

system design phase

b)

system support and maintenance phase

c)

system planning phase

d)

system analysis phase

12.

In a systems development life cycle (SDLC) model, the purpose of the _____ is to create a physical model that will satisfy all documented requirements for the system.

a)

system design phase

b)

system support and maintenance phase

c)

system planning phase

d)

system analysis phase

13.

During the _____ of the systems development life cycle (SDLC), a new system is constructed

a)

system design phase

b)

system implementation phase

c)

system planning phase

d)

system analysis phase

14.

Agile methods typically use a(n) _____ , which represents a series of iterations based on user feedback

a)

incremental model

b)

extreme model

c)

spiral model

d)

evaluative model