CMA 480 - Exam 2 Review - Chapters:4-6

Total questions: 60

Worksheet time: 20mins

Name
Class
Date
1.

In protest of unfair working conditions, 10,000 workers marched

from the city hall to Union Square in ___, holding the first ever

Labor Day Parade in 1882.

a)

Chicago

b)

Los Angeles

c)

San Francisco

d)

New York City

2.

The ___ Act protects the rights of workers and unions to organize

and set up fair bargaining agreements between labor and

management.

a)

National Labor Relations

b)

Norris-LaGuardia

c)

Davis-Bacon

d)

Anti-Kickback

3.

The ___ Act prohibits employers from retaliating against

employees for reporting violations in the private sector as well as

on local, state, and federal jobs.

a)

National Aprrenticeship

b)

Federal Unemployment Tax

c)

Fair Labor Standards

d)

Labor Management Relations

4.

The ___ Act disallows wage discrimination based on gender.

a)

Civil Rights

b)

Americans with Disabilities

c)

Age Discrimination in Employment

d)

Equal Pay

5.

The purpose of the ___ Act is to protect the rights of qualified,

disabled workers on federally funded projects of $10,000 or more.

a)

Age Discrimination in Employment

b)

Rehabilitation

c)

Americans with Disabilities

d)

Civil Rights

6.

The Industrial Revolution occurred between the late eighteenth and

nineteenth centuries and was brought about by the introduction of

___.

a)

labor unions

b)

steam power

c)

labor laws

d)

production machinery

7.

A ___ is an elected official who is empowered by each local union

to negotiate work agreements on its behalf and enforce them.

a)

union steward

b)

union representative

c)

business agent

d)

shop steward

8.

The ___ extends membership to those who work as heavyequipment

operators, mechanics, surveyors, and other diverse

tradesworkers within the construction industry.

a)

International Brotherhood of Electrical Workers

b)

Sheet Metal Workers International Association

c)

International Union of Operating Engineers

d)

International Federation of Professional and Technical Engineers

9.

The largest union in the AFL-CIO is the ___.

a)

American Federation of State, County and Municipal Employees

b)

International Association of Fire Fighters

c)

International Federation of Professional and Technical Engineers

d)

United Steelworkers

10.

Local ___ is the geographic area or union subdivision certified by

the government where the authority of a particular labor union

extends.

a)

territory

b)

sect

c)

jurisdiction

d)

chapter

11.

___ is a process used by unions and trade organizations to

negotiate labor and management agreements.

a)

Mediation

b)

Picketing

c)

Arbitration

d)

Collective bargaining

12.

A ___ is a work stoppage initiated by an employer during a labor

dispute.

a)

lockout

b)

boycott

c)

labor strike

d)

mediation

13.

A ___ occurs when a union refuses to permit union workers to work

for, deal with, or patronize an employer with whom there is a

conflict.

a)

mediation

b)

labor strike

c)

boycott

d)

lockout

14.

A(n) ___ wage is the hourly wage rate plus supplemental benefits

for a given area.

a)

overtime

b)

living

c)

open-shop

d)

prevailing

15.

The standard work day is 8 hr or 10 hr, and a weekly maximum is

___ hr.

a)

40

b)

80

c)

100

d)

120

16.

A ___ is a set of instructions created by a designer and used by a

contractor to estimate project costs and build a project.

a)

project manual

b)

contract document

c)

terms and conditions document

d)

project bid

17.

Written information contained in the project manual is used to

specify building and finish materials and to provide the terms and

conditions of the contract to ___ during bidding and construction.

a)

project managers

b)

contractors

c)

project owners

d)

lead designers

18.

___, being financially responsible for the project, set the budget

and criteria for the project design.

a)

Project owners

b)

Lead designers

c)

Project managers

d)

Contractors

19.

Design firms select a design project manager or ___ to oversee the

various design aspects of a project.

a)

consultant

b)

coordinator

c)

lead manager

d)

lead designer

20.

The ___ has published a handbook that provides descriptions, a

sequence of design phases, design checklists, and other

information related to organizing projects.

a)

IEC

b)

NFPA

c)

AIA

d)

DOE

21.

Owners work with designers to create a "___" that includes all

project features and spatial requirements in order to start a design.

a)

scope of work

b)

depth of work

c)

project manual

d)

feasibility study

22.

The project information is conveyed to the ___, who is ultimately

responsible for the means and methods of construction.

a)

lead designer

b)

project manager

c)

contractor

d)

project owner

23.

As the design becomes more refined, costs become ___.

a)

more accurate and hard to determine

b)

more accurate and easy to determine

c)

less accurate and hard to determine

d)

less accurate and easy to determine

24.

A ___ study is a study or analysis of a proposed project to

determine whether the project is technically feasible, cost-effective,

and potentially profitable.

a)

viablility

b)

profitability

c)

comprehensive project

d)

feasibility

25.

Project viability relies heavily on a(n) ___ budget, balancing the

scope of work, and project costs.

a)

owner's

b)

manager's

c)

contractor's

d)

designer's

26.

Examples of soft costs are land acquisitions and ___.

a)

excavations

b)

interest on loans

c)

underground utilities

d)

roofing

27.

Hard costs make up ___ of a project budget.

a)

all

b)

the majority

c)

exactly half

d)

less than 30%

28.

A(n) ___ structure works best on projects in which the scope of

work is not well-defined or the project is small or short in duration.

a)

fixed fee

b)

percentage-based fee

c)

lump sum

d)

hourly fee

29.

Services provided in the administration and evaluation phase

include the identification of project site conditions and ___.

a)

development of conceptual drawings

b)

evaluation of the cost and performance of proposed features, materials, and systems

c)

selection of the layout of structural, mechanical, electrical, and plumbing systems

d)

establishment of a preliminary project schedule

30.

___ is the initial design phase that defines the general scope and

conceptual design of a project.

a)

Schematic design (SD)

b)

Design development (DD)

c)

Value engineering (VE)

d)

Research evaluation (RE)

31.

___ is the design phase that further develops and refines a

schematic design.

a)

Schematic design (SD)

b)

Design development (DD)

c)

Value engineering (VE)

d)

Research evaluation (RE)

32.

The construction document phase is the ___ design phase.

a)

first

b)

second

c)

third

d)

final

33.

A(n) ___ is the addition of omitted or updated information to a set

of construction drawings, technical specifications, or a contract.

a)

estimate

b)

addendum

c)

bid

d)

amendment

34.

Once bidding is complete and a contract has been awarded, the

construction ___ phase begins.

a)

document

b)

design

c)

procurement

d)

administration

35.

Once all the bids are received, the ___ assists the owner in

evaluating the bids.

a)

designer

b)

contractor

c)

manager

d)

architect

36.

A ___ contract is a contract that is awarded to a contractor based

on a mutual agreement with an owner without going through a

formal bidding process.

a)

streamlined

b)

negotiated

c)

finalized

d)

procured

37.

Construction administration is a service that most ___ provide as

part of their contract with an owner.

a)

contractors

b)

architects

c)

designers

d)

managers

38.

___ planning is a process that involves investigating the feasibility,

developing the design, and estimating the timeline and costs of a

proposed project.

a)

Project

b)

Financial

c)

Design

d)

Comprehensive

39.

Lenders who provide funding for a project require a solid plan and

financial report that take many variables into account along with

adequate safeguards in place ___.

a)

as construction begins

b)

at the end of the project

c)

before a project is started

d)

a month before the project is completed

40.

A ___ is a legal charge against a property for securing a payment

of debt or performance of an obligation.

a)

tithe

b)

contract

c)

budget

d)

lien

41.

There are ___ commonly used payment systems for project

construction.

a)

two

b)

three

c)

four

d)

five

42.

The most commonly used payment system is the ___.

a)

fixed-fee system

b)

lump-sum contract

c)

progress payment system

d)

percentage-based contract

43.

A ___ is a payment arrangement that is based on the percentage

of work completed by a contractor.

a)

stipulated-sum contract

b)

fixed-fee system

c)

lump-sum contract

d)

progress payment system

44.

The progress payment system is most often used on ___.

a)

residence construction

b)

small construction projects

c)

large construction projects

d)

light commercial renovations

45.

Financial planning by the ___ is an essential component of a

successful project.

a)

owner

b)

lender

c)

advisor

d)

contractor

46.

Public project funding is primarily derived from public revenues

such as taxes and ___.

a)

long-term loans

b)

bonds

c)

short-term loans

d)

corporate investments

47.

Privately funded projects include ___.

a)

industrial facilities

b)

bridges

c)

municipal buildings

d)

infrastructure

48.

___ is any property that a borrower uses as security for payment of

a loan or debt.

a)

Appropriation

b)

An asset

c)

A liability

d)

Collateral

49.

The ___ offers low-interest mortgages to families interested in

home ownership.

a)

DPP

b)

FHA

c)

HUD

d)

IRS

50.

A ___ asset is an asset that is held by a company for one year or

less.

a)

long-term

b)

prepaid

c)

current

d)

fixed

51.

A(n) ___ is any financial obligation of, such as a lien, or potential

loss experienced by a business or individual.

a)

liability

b)

line of credit

c)

municipal bond

d)

asset

52.

A(n) ___ is a fixed amount of money issued by a lending institution

that a business or individual can use as needed.

a)

asset

b)

line of credit

c)

liability

d)

municipal bond

53.

A(n) ___ bond is a municipal bond that is secured by the future

revenue to be generated, such as toll from roads and bridges,

utility fees, and rent, from the entity funded by the bond.

a)

general obligation

b)

assessment

c)

corporate

d)

revenue

54.

A(n) ___ grant is a monetary award based on a competitive

process.

a)

formula

b)

municipal

c)

discretionary

d)

equity

55.

Nonprofit organizations are often granted a tax-exempt status by

the ___.

a)

IRS

b)

FHA

c)

DPP

d)

HUD

56.

Encourage "____"

a)

the way

b)

the heart

c)

a shared vision

d)

the process

e)

others to act

57.

Model "____"

a)

the way

b)

the heart

c)

a shared vision

d)

the process

e)

others to act

58.

Inspire "____"

a)

the way

b)

the heart

c)

a shared vision

d)

the process

e)

others to act

59.

Enable "____"

a)

the way

b)

the heart

c)

a shared vision

d)

the process

e)

others to act

60.

Challenge "____"

a)

the way

b)

the heart

c)

a shared vision

d)

the process

e)

others to act