wayground logo

Free Printable Worksheets

NEW

Font size

S
M
L
XL
Worksheets

NPCP 9 vents and venting

Total questions: 20

Worksheet time: 30mins

Name
Class
Date
1.

Air circulation shall be assured throughout all parts of the excreta drainage system by means of _____ installed in accordance with the requirements of this Chapter and as required in this code.

a)

vent pipes

b)

air gap

2.

Each plumbing fixture trap, except as otherwise provided in this Code,

shall be protected against _____

a)

siphonage and back-pressure

b)

Vents and Venting

3.

Where permitted by the Administrative Authority, vent piping may be omitted on an interceptor when such interceptor acts as primary settling tank and discharges through a horizontal indirect waste pipe into a secondary interceptor. The second interceptor shall be properly ____

a)

tapped and vented.

b)

installed

4.

Traps serving sinks which are part of the equipment of bars, soda fountains and counters need not be vented when the location and construction of such bars, soda fountains and counters is to make it impossible to do so.

When such conditions exist, said sink shall discharge by means of approved ______ into a floor sink or other approved type receptor.

a)

indirect waste pipe

b)

direct waste pipe

5.

No galvanized wrought iron or galvanized steel pipe shall be used underground and shall be kept at least _____.

a)

15 cm. above ground

b)

30 cm. above ground

6.

Vent fittings shall be cast iron, galvanized malleable iron or galvanized steel, lead, copper~ brass, ABS, PVC or other approved materials, except that no galvanized malleable iron or galvanized steel fittings shall be buried underground but shall be kept _____.

a)

at least 152 mm above finish ground level .

b)

at least 300 mm above finish ground level .

7.

Changes in direction of vent piping shall be made by the appropriate use of approved fittings and no such pipe shall be ____.

Burred ends shall be reamed to the full bore of the pipe.

a)

strained or bent

b)

approved elbow

8.

The sizes of vent piping shall be determined from its length and the total

number of _____

a)

flxture units

b)

Water closet

9.

The length of horizontal portion of a vent may exceed ____ of the total length of vertical and horizontal portions as limited by Table 7.s provided the vent is increased to one pipe size larger for its entire length.

a)

one-third (1/3)

b)

one-haft (1/2)

10.

All vent pipes shall extend undiminished in size above the roof or shall be reconnected with the soil or waste stack vent of proper size at a point below

the roof, the vent through the roof (VSTR) shall be increased ___above the reconnection point of stack vent and horizontal vent.

a)

1/3 pipe size

b)

one ( l) pipe size

11.

Each vent pipe or stack through roof (SVTR) shall extend its flashing all around and the stack vent shall terminate vertically not less than ____ from any vertical surface nearby

a)

15 cm. above the roof nor less than 0.3 meter

b)

10 cm. above the roof nor less than 0.2 meter

12.

Each vent opening shall terminate not less than three (3) meters from, or at least ___ meter above any openable window, door opening, air intake or vent shaft nor less than 0.9 meter away from any lot line, alley and street boundary lines.

a)

0. 9 meter

b)

0. 3 meter

13.

Vent pipes shall be extended separately or combined, of full required size not less than ___ above the roof or fire wall.

a)

15 cm

b)

20 cm

14.

Vertical vent pipes for outdoor installations shall extend to at least __ meter distant from any part of the roof that is used tor other purposes and shall extend not less than 2.1 meter above such roof and shall be securely stayed.

a)

3 meters

b)

2.2 meters

15.

The yoke vent connection with the vent stack shall be placed not less than___ meter above the floor level, and the yoke vent connection with the drainage stack shall be by means of a wye branch fitting placed below the fixture branch serving that floor.

a)

1 meter

b)

.30 meter

16.

Each soil or waste stack which extends ten ( 1 0) or more stories above the building drain shall be served by a parallel vent stack which shall extend undiminished in size from its upper terminal at the roof and connect to the soil or waste stack at ground level and at every fifth floor levels called ___

a)

yoke vent

b)

branch drain

17.

____ shall be cast iron, galvanized steel, galvanized wrought iron, lead, copper, brass, Schedule 40 ABS DWV, Series 1000 PVC DWV 111 other approved materials having a smooth and uniform bore

a)

Vent pipes

b)

water valves

18.

No ____ shall be Used underground and shall be kept at least 152 mm ahove ground.

a)

galvanized wrought iron or galvanized steel pipe

b)

PVC pipe

19.

The size of vent piping shall be detennined from its length and the total number of ___

a)

fixture units

b)

room size

20.

Vertical vent pipes for outdoor installations shall extend to at least 3 meter distant from any part of the roof that is used tor other purposes and shall extend not less than ____above such roof and shall be securely stayed.

a)

2.1 meters

b)

2.5 meters